Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 2: Line 2:
  
 
* Worked on ExSim integration
 
* Worked on ExSim integration
** Wrote output file converted ExSim --> RotD50
+
** Re-worked the plot_map script to generate fault trace from SRC file
** Created XML file to run ExSim within the Platform
+
* North Palm Springs validation
* Ran ExSim
+
** GP simulation completed on broadband
** Very fast, result looks good!
+
** Ran 50-realization on epicenter
* Created North Palm Springs Validation package
+
** Posted results to wiki, sent results to RG
** Running validation using GP method
+
** Started second 50-realization set with FMAX=100Hz
  
 
== Today: ==
 
== Today: ==
  
* Complete NPS validation using GP
+
* North Palm Springs validation
** Post results on the wiki
+
** Compare 100Hz against 10Hz sets
 
* Continue ExSim integration
 
* Continue ExSim integration
** Generate map without srf file
 
 
** Generate single GOF plot with only RD50
 
** Generate single GOF plot with only RD50
 +
* Generate XYZ srf file for KO
 
** Work on workflow generator
 
** Work on workflow generator
  
Line 22: Line 22:
  
 
== Followups: ==
 
== Followups: ==
* No
+
* BBP science call at 2pm

Revision as of 18:01, 8 February 2013

Yesterday:

  • Worked on ExSim integration
    • Re-worked the plot_map script to generate fault trace from SRC file
  • North Palm Springs validation
    • GP simulation completed on broadband
    • Ran 50-realization on epicenter
    • Posted results to wiki, sent results to RG
    • Started second 50-realization set with FMAX=100Hz

Today:

  • North Palm Springs validation
    • Compare 100Hz against 10Hz sets
  • Continue ExSim integration
    • Generate single GOF plot with only RD50
  • Generate XYZ srf file for KO
    • Work on workflow generator

Blocked:

  • No

Followups:

  • BBP science call at 2pm