Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Worked on ExSim integration
 
** Re-worked the plot_map script to generate fault trace from SRC file
 
 
* North Palm Springs validation
 
* North Palm Springs validation
** GP simulation completed on broadband
+
** 50-realization results shared with RG, posted on wiki
** Ran 50-realization on epicenter
+
** Second set of 50-realization at FMAX=100Hz completed
** Posted results to wiki, sent results to RG
+
* Got GFs for Japan
** Started second 50-realization set with FMAX=100Hz
+
** E-mailed RG about validation parameters for Niigata and Tottori
 +
* Continued ExSim integration
 +
** Generated single GOF plot with only RotD50 component
 +
* BBP science call
  
 
== Today: ==
 
== Today: ==
  
 +
* Generate XYZ srf file for KO
 
* North Palm Springs validation
 
* North Palm Springs validation
 
** Compare 100Hz against 10Hz sets
 
** Compare 100Hz against 10Hz sets
 +
* Create Japan GFs Broadband package
 +
* Niigata and Tottori events
 
* Continue ExSim integration
 
* Continue ExSim integration
** Generate single GOF plot with only RD50
 
* Generate XYZ srf file for KO
 
 
** Work on workflow generator
 
** Work on workflow generator
  
Line 22: Line 24:
  
 
== Followups: ==
 
== Followups: ==
* BBP science call at 2pm
+
* Evaluation with PM @ 11:30am

Revision as of 18:10, 11 February 2013

Yesterday:

  • North Palm Springs validation
    • 50-realization results shared with RG, posted on wiki
    • Second set of 50-realization at FMAX=100Hz completed
  • Got GFs for Japan
    • E-mailed RG about validation parameters for Niigata and Tottori
  • Continued ExSim integration
    • Generated single GOF plot with only RotD50 component
  • BBP science call

Today:

  • Generate XYZ srf file for KO
  • North Palm Springs validation
    • Compare 100Hz against 10Hz sets
  • Create Japan GFs Broadband package
  • Niigata and Tottori events
  • Continue ExSim integration
    • Work on workflow generator

Blocked:

  • No

Followups:

  • Evaluation with PM @ 11:30am