Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to search| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
| − | * | + | * Updated some trac tickets |
| − | ** | + | * ExSim |
| − | ** | + | ** Set up LABasin region to run ExSIM simulations |
| − | * | + | ** Generated plots for Northridge and Whittier Narrows |
| − | * | + | ** Sent results to KA and CG |
| − | * | + | ** Could not find any real problems in KA's runs |
| − | + | ** LOMAP: 10m, Northridge: 5m, Whittier Narrows: 2m | |
| − | ** | + | * Tested workflow generator |
| + | * Updated gmpe comparison scripts to work with ExSIM | ||
| + | * Completed Tottori 120s and 200s runs | ||
| + | ** Basically take the same time | ||
== Today: == | == Today: == | ||
| − | * | + | * Send e-mail to RG about simulation time |
| − | + | * Continue testing workflow generator | |
| − | |||
| − | |||
| − | |||
| − | * | ||
* Trim acceptance tests | * Trim acceptance tests | ||
** from 99 --> about 10 | ** from 99 --> about 10 | ||
| + | * Modify cluster scripts to match updated workflow generator | ||
== Blocked: == | == Blocked: == | ||
| Line 25: | Line 25: | ||
== Followups: == | == Followups: == | ||
| − | * | + | * No |
Revision as of 18:08, 7 March 2013
Contents
Yesterday:
- Updated some trac tickets
- ExSim
- Set up LABasin region to run ExSIM simulations
- Generated plots for Northridge and Whittier Narrows
- Sent results to KA and CG
- Could not find any real problems in KA's runs
- LOMAP: 10m, Northridge: 5m, Whittier Narrows: 2m
- Tested workflow generator
- Updated gmpe comparison scripts to work with ExSIM
- Completed Tottori 120s and 200s runs
- Basically take the same time
Today:
- Send e-mail to RG about simulation time
- Continue testing workflow generator
- Trim acceptance tests
- from 99 --> about 10
- Modify cluster scripts to match updated workflow generator
Blocked:
- No
Followups:
- No