Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* Checked in arias duration code into svn
+
* Checked-in updated test code
* Sent e-mail to KA regarding updates on ExSim
+
** new exsim test, reference files
* Sent e-mail to JA regarding code availability
+
** duplicate tests deleted
* Used coverage module on unit tests
+
* Contacted KA regarding ExSIM updates
**  Coverage is 36% (with caveats)
+
** KA is waiting for updates PSAs from CG
* Worked on test cases
+
** Finish California events, before adding Japan events
** Removed duplicate unit tests
+
* Updated tickets
** Created unit test for ExSim
+
* Started work on BBP status code
* Talked to ML regarding the CSEP metadata capture code
+
** Use CSEP logger and framework
 +
** Modify to use BBP utility functions and naming conventions
  
 
== Today: ==
 
== Today: ==
  
* Check-in revised test suites
+
* Continue integration of CSEP code into BBP
* Update tickets
+
* Close more tickets
* Add CSEP environment metadata code to BBP
+
* Broadband science call
  
 
== Blocked: ==
 
== Blocked: ==
Line 21: Line 22:
  
 
== Followups: ==
 
== Followups: ==
* No
+
* Broadband discussion with PM @ TBD
 +
* Broadband Science call @ 2pm

Revision as of 16:57, 22 March 2013

Yesterday:

  • Checked-in updated test code
    • new exsim test, reference files
    • duplicate tests deleted
  • Contacted KA regarding ExSIM updates
    • KA is waiting for updates PSAs from CG
    • Finish California events, before adding Japan events
  • Updated tickets
  • Started work on BBP status code
    • Use CSEP logger and framework
    • Modify to use BBP utility functions and naming conventions

Today:

  • Continue integration of CSEP code into BBP
  • Close more tickets
  • Broadband science call

Blocked:

  • No

Followups:

  • Broadband discussion with PM @ TBD
  • Broadband Science call @ 2pm