*Blue Waters
 
*Blue Waters
**Worked on debugging GPU code
+
**Reformatted GPU SGTs for calculating hazard curve
*Emailed Rob about SBSM high ground motions
+
*Stampede
*Emailed Rob with new velocity plots
+
**Calculated GPU hazard curve - matches almost exactly!
 +
*Started zipping 2011-12 CyberShake runs
  
 
== Today ==
 
== Today ==
 
*Blue Waters
 
*Blue Waters
**Reformat GPU SGTs for calculating hazard curve
+
**Back to work on coscheduling
**Continue work on coscheduling
+
**Get site list for Study 13.4, start the run
*Identify directories used in 2011-12 CyberShake runs and zip
+
*Email GPU hazard curve results out
*If John upgraded aftershock disk, rerun monitord population
+
*Monitor zipping
 +
*Modify stage-out location to scec-04
  
 
== Blocked ==
 
== Blocked ==
Line 17: Line 19:
 
== Follow-ups ==  
 
== Follow-ups ==  
 
*GB call?
 
*GB call?
 +
*CyberShake technical call
 +
  
 
Check on SA forward sim
 
Check on SA forward sim

Revision as of 17:52, 17 April 2013

Yesterday

  • Blue Waters
    • Reformatted GPU SGTs for calculating hazard curve
  • Stampede
    • Calculated GPU hazard curve - matches almost exactly!
  • Started zipping 2011-12 CyberShake runs

Today

  • Blue Waters
    • Back to work on coscheduling
    • Get site list for Study 13.4, start the run
  • Email GPU hazard curve results out
  • Monitor zipping
  • Modify stage-out location to scec-04

Blocked

  • No

Follow-ups

  • GB call?
  • CyberShake technical call


Check on SA forward sim Email Stampede staff, let them know about node crashing solution Finish wiki entries for Stampede and Blue Waters validation

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration