Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | |||
* BBP Call with PS and CG | * BBP Call with PS and CG | ||
− | * GPU | + | * GPU paper turned in |
== Today: == | == Today: == | ||
− | * | + | * Finalize CME meeting |
+ | * Talk about workflows for BBP with Fabio | ||
* | * | ||
Revision as of 16:40, 29 April 2013
Contents
Yesterday:
- BBP Call with PS and CG
- GPU paper turned in
Today:
- Finalize CME meeting
- Talk about workflows for BBP with Fabio
Blocked:
- No
Followups:
- No
Pending:
- CVM Evaluation system differences
- SRC files posted for SGS