== Yesterday ==
 
== Yesterday ==
*Worked on GPU technical paper for SC
+
*Blue Waters:
*Finished deleting 2011-12 workflow logs
+
**Worked on coscheduling - discovered that PMC works if seis_psa is compiled with GNU
 +
*Focal upgrade completed, resumed runs
  
 
== Today ==
 
== Today ==
*Blue Waters
+
*Blue Waters:
**Work on coscheduling - Gideon suggests issue is not with PMC, gave suggestions
+
**Continue working on coscheduling - try out larger tests, restructure queries to be faster
 +
**Configure 1 Hz run with AWP-SGT CPU
 
*Reply to Xin about Graves Qp and Qs
 
*Reply to Xin about Graves Qp and Qs
*Ping John to see if focal upgrade is complete so we can resume runs
 
  
 
== Blocked ==
 
== Blocked ==
*No
+
*Stampede down today
  
 
== Follow-ups ==  
 
== Follow-ups ==  

Revision as of 17:14, 30 April 2013

Yesterday

  • Blue Waters:
    • Worked on coscheduling - discovered that PMC works if seis_psa is compiled with GNU
  • Focal upgrade completed, resumed runs

Today

  • Blue Waters:
    • Continue working on coscheduling - try out larger tests, restructure queries to be faster
    • Configure 1 Hz run with AWP-SGT CPU
  • Reply to Xin about Graves Qp and Qs

Blocked

  • Stampede down today

Follow-ups

  • No


Check on SA forward sim Email Stampede staff, let them know about node crashing solution Finish wiki entries for Stampede and Blue Waters validation

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration