Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Continued refactoring DAX generator
+
*Finished refactoring and testing PP workflow, to the extent possible
*Submitted SCEC AM abstract
+
*Tested integrated workflow
 +
*Answered En-Jui's question about UCVM
 +
*Replied to Yifeng about coscheduling for SC paper
  
 
== Today ==
 
== Today ==
*Finish refactoring and test PP workflow
+
*Work with 1 Hz rupture surfaces on HPC
*Test integrated workflow
 
*Start work with 1 Hz rupture surfaces
 
  
 
== Blocked ==
 
== Blocked ==

Revision as of 17:04, 13 August 2013

Yesterday

  • Finished refactoring and testing PP workflow, to the extent possible
  • Tested integrated workflow
  • Answered En-Jui's question about UCVM
  • Replied to Yifeng about coscheduling for SC paper

Today

  • Work with 1 Hz rupture surfaces on HPC

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration