Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | *Resumed | + | *Resumed 2s SA db insertion |
− | + | *Compared 1 Hz and 0.5 Hz SGTs, look good | |
− | + | *Came up with ideas for reducing PP memory requirements | |
− | * | + | *Calculated BW TEST curve with workflow tools, matches reference |
− | + | *Asked HPCC to add BW proxy to grid-mapfile | |
− | |||
− | * | ||
− | * | ||
− | * | ||
== Today == | == Today == | ||
− | * | + | *Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison |
− | + | *Test AWP-ODC-SGT GPU with modified output format | |
− | + | *Work on poster | |
− | + | *Monitor 2s SA db inserts | |
− | + | *Retry UCVM | |
− | + | *Try BBP when the RC is posted | |
− | |||
− | |||
− | * | ||
− | * | ||
== Blocked == | == Blocked == | ||
Line 26: | Line 18: | ||
== Follow-ups == | == Follow-ups == | ||
− | * | + | *CyberShake calls at 11 |
+ | *Skype with John Yu at 1 | ||
== Areas of Responsibilities == | == Areas of Responsibilities == |
Revision as of 17:24, 4 September 2013
Yesterday
- Resumed 2s SA db insertion
- Compared 1 Hz and 0.5 Hz SGTs, look good
- Came up with ideas for reducing PP memory requirements
- Calculated BW TEST curve with workflow tools, matches reference
- Asked HPCC to add BW proxy to grid-mapfile
Today
- Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison
- Test AWP-ODC-SGT GPU with modified output format
- Work on poster
- Monitor 2s SA db inserts
- Retry UCVM
- Try BBP when the RC is posted
Blocked
- No
Follow-ups
- CyberShake calls at 11
- Skype with John Yu at 1
Areas of Responsibilities
- CyberShake 1.4
- Broadband CyberShake
- Code migration