Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to searchLine 7: | Line 7: | ||
== Today == | == Today == | ||
+ | *Summary for Mats | ||
*Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison | *Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison | ||
*Test AWP-ODC-SGT GPU with modified output format | *Test AWP-ODC-SGT GPU with modified output format |
Revision as of 17:31, 4 September 2013
Yesterday
- Resumed 2s SA db insertion
- Compared 1 Hz and 0.5 Hz SGTs, look good
- Came up with ideas for reducing PP memory requirements
- Calculated BW TEST curve with workflow tools, matches reference
- Asked HPCC to add BW proxy to grid-mapfile
Today
- Summary for Mats
- Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison
- Test AWP-ODC-SGT GPU with modified output format
- Work on poster
- Monitor 2s SA db inserts
- Retry UCVM
- Try BBP when the RC is posted
Blocked
- No
Follow-ups
- CyberShake calls at 11
- Skype with John Yu at 1
Areas of Responsibilities
- CyberShake 1.4
- Broadband CyberShake
- Code migration