Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 7: Line 7:
  
 
== Today ==
 
== Today ==
 +
*Summary for Mats
 
*Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison
 
*Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison
 
*Test AWP-ODC-SGT GPU with modified output format
 
*Test AWP-ODC-SGT GPU with modified output format

Revision as of 17:31, 4 September 2013

Yesterday

  • Resumed 2s SA db insertion
  • Compared 1 Hz and 0.5 Hz SGTs, look good
  • Came up with ideas for reducing PP memory requirements
  • Calculated BW TEST curve with workflow tools, matches reference
  • Asked HPCC to add BW proxy to grid-mapfile

Today

  • Summary for Mats
  • Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison
  • Test AWP-ODC-SGT GPU with modified output format
  • Work on poster
  • Monitor 2s SA db inserts
  • Retry UCVM
  • Try BBP when the RC is posted

Blocked

  • No

Follow-ups

  • CyberShake calls at 11
  • Skype with John Yu at 1

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration