Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to search (→Today) |
|||
Line 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | *Emailed blurb to Mats |
− | * | + | *Finished 2s SA db inserts, emailed Tom and Feng |
− | * | + | *Emailed slides to Tom summarizing CyberShake progress in the past year |
− | * | + | *Tried BBP, MOGof unit test took forever |
− | * | + | *Queued up full-scale curve on BW |
+ | *CyberShake calls | ||
+ | *Meeting with John Yu | ||
== Today == | == Today == | ||
− | * | + | *Work on poster |
− | *Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison | + | *Try BBP RC2 |
+ | *Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison, check into large memory nodes | ||
*Test AWP-ODC-SGT GPU with modified output format | *Test AWP-ODC-SGT GPU with modified output format | ||
− | * | + | *Check on full-scale BW |
− | |||
− | |||
− | |||
− | |||
− | |||
== Blocked == | == Blocked == | ||
Line 21: | Line 19: | ||
== Follow-ups == | == Follow-ups == | ||
− | * | + | *No |
− | |||
== Areas of Responsibilities == | == Areas of Responsibilities == |
Revision as of 19:49, 5 September 2013
Yesterday
- Emailed blurb to Mats
- Finished 2s SA db inserts, emailed Tom and Feng
- Emailed slides to Tom summarizing CyberShake progress in the past year
- Tried BBP, MOGof unit test took forever
- Queued up full-scale curve on BW
- CyberShake calls
- Meeting with John Yu
Today
- Work on poster
- Try BBP RC2
- Try synthesizing single seismograms with 1 Hz and 0.5 Hz SGTs, do comparison, check into large memory nodes
- Test AWP-ODC-SGT GPU with modified output format
- Check on full-scale BW
Blocked
- No
Follow-ups
- No
Areas of Responsibilities
- CyberShake 1.4
- Broadband CyberShake
- Code migration