Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
  
* SCEC Meeting
+
* Completed AGU registration form, delivered to DG
* SCEC Seminar
+
* Looked into SG's failed runs
* Moved data for Mw 7.0 scenarios (ExSIM, GP)
+
** SRF files look misformatted
** SDSU scenario failed
+
** Contacted SG with examples of good, bad files
* Contacted JD, KW with link to new data files
+
* More tests for new DT scheme
* Exchange with KO regarding BBToolbox fix(es)
+
** Good for svn check-in now
** Running Mw 7.0 scenario again with updated geometry from RT
+
* Modified SRF plot to use axis labels as requested by KW
  
 
== Today: ==
 
== Today: ==
  
* Look into SG's failed run
+
* Continue monitoring Mw 7.0 event
* Work on SRF plotting code
+
* Contact AP regarding new 1D vs 3D plots
 +
* Check latest BBP code fixes/additions into svn
 
* Look into GP's new rupture generator
 
* Look into GP's new rupture generator
  
Line 19: Line 20:
  
 
== Followups: ==
 
== Followups: ==
* No
+
* Cybershake @ 11am

Revision as of 17:08, 16 October 2013

Yesterday:

  • Completed AGU registration form, delivered to DG
  • Looked into SG's failed runs
    • SRF files look misformatted
    • Contacted SG with examples of good, bad files
  • More tests for new DT scheme
    • Good for svn check-in now
  • Modified SRF plot to use axis labels as requested by KW

Today:

  • Continue monitoring Mw 7.0 event
  • Contact AP regarding new 1D vs 3D plots
  • Check latest BBP code fixes/additions into svn
  • Look into GP's new rupture generator

Blocked:

  • No

Followups:

  • Cybershake @ 11am