Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Integrate PetaSHA3 feedback |
− | * | + | * Iteration Planning BBP |
− | * | + | * Contact EH about ShakeAlert Testing |
− | * | + | * UCVM discussion David |
− | + | ||
− | == Today: == | + | == Today: == |
− | * | + | * XSEDE call Peter Powers 10am |
+ | * Call with JB 11am | ||
+ | * Meet with Admins 1pm | ||
* PRAC Information | * PRAC Information | ||
− | |||
− | |||
== Blocked: == | == Blocked: == | ||
Line 18: | Line 18: | ||
== Pending: == | == Pending: == | ||
− | |||
* Travel plans to SC and AGU | * Travel plans to SC and AGU | ||
* Contact with HPCC for SC plans | * Contact with HPCC for SC plans |
Revision as of 17:54, 29 October 2013
Contents
Yesterday:
- Integrate PetaSHA3 feedback
- Iteration Planning BBP
- Contact EH about ShakeAlert Testing
- UCVM discussion David
== Today: ==
- XSEDE call Peter Powers 10am
- Call with JB 11am
- Meet with Admins 1pm
- PRAC Information
Blocked:
- No
Followups:
- No
Pending:
- Travel plans to SC and AGU
- Contact with HPCC for SC plans
- Finalize SC BOF and Posters
- Security Discussion with SC
- Backup strategy with group
- setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Add AWstats to bbpvault