Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 16: | Line 16: | ||
== Pending: == | == Pending: == | ||
+ | * Formalize the simulation plans for NR | ||
+ | * Call with SD and KO on dynamic rupture | ||
* Find images from CMU of circular GTL structures | * Find images from CMU of circular GTL structures | ||
* Security Discussion with SC | * Security Discussion with SC |
Revision as of 06:39, 25 November 2013
Contents
Yesterday:
- BW Call
- Travel plans to AGU
Today:
- HPCC talk on bhp
- BBP iteration plan
- Call with RWG 1:30pm
- BBP Call
Blocked:
- No
Followups:
Pending:
- Formalize the simulation plans for NR
- Call with SD and KO on dynamic rupture
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file