Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 5: | Line 5: | ||
== Today: == | == Today: == | ||
* Ask SC to propose BW metrics from paper | * Ask SC to propose BW metrics from paper | ||
+ | * File NCAR �final report | ||
+ | * Setup INCITE Startup Request Call | ||
== Blocked: == | == Blocked: == | ||
Line 10: | Line 12: | ||
== Followups: == | == Followups: == | ||
− | * | + | * No |
== Pending: == | == Pending: == | ||
+ | *THJ and YC Call | ||
+ | * NGA-E Plan link to THJ | ||
+ | * FW ABF into CME codebase | ||
* Formalize the simulation plans for NR | * Formalize the simulation plans for NR | ||
* Call with SD and KO on dynamic rupture | * Call with SD and KO on dynamic rupture |
Revision as of 23:18, 25 November 2013
Contents
Yesterday:
- BW Call
- Travel plans to AGU
Today:
- Ask SC to propose BW metrics from paper
- File NCAR �final report
- Setup INCITE Startup Request Call
Blocked:
- No
Followups:
- No
Pending:
- THJ and YC Call
- NGA-E Plan link to THJ
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Call with SD and KO on dynamic rupture
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file