Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 5: Line 5:
 
== Today: ==
 
== Today: ==
 
* Ask SC to propose BW metrics from paper
 
* Ask SC to propose BW metrics from paper
* File NCAR �final report
+
* File NCAR final report
 
* Setup INCITE Startup Request Call
 
* Setup INCITE Startup Request Call
  

Revision as of 23:18, 25 November 2013

Yesterday:

  • BW Call
  • Travel plans to AGU

Today:

  • Ask SC to propose BW metrics from paper
  • File NCAR final report
  • Setup INCITE Startup Request Call

Blocked:

  • No

Followups:

  • No

Pending:

  • THJ and YC Call
  • NGA-E Plan link to THJ
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Call with SD and KO on dynamic rupture
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file