Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 3: | Line 3: | ||
== Today: == | == Today: == | ||
− | * DOE 2013 Final Report | + | * DOE INCITE 2013 Final Report |
* SCEC EarthCube participation | * SCEC EarthCube participation | ||
− | * Chair Palace | + | * Visit Chair Palace |
− | * SSA Abstracts | + | * SSA Abstracts Due Jan 10 |
+ | * UCVM email list (set group posting) | ||
+ | * BBP Storage review | ||
+ | * Update Calendars | ||
+ | * Tom on NR products | ||
== Blocked: == | == Blocked: == |
Revision as of 17:59, 6 January 2014
Contents
Yesterday:
- Goodwill towards others
Today:
- DOE INCITE 2013 Final Report
- SCEC EarthCube participation
- Visit Chair Palace
- SSA Abstracts Due Jan 10
- UCVM email list (set group posting)
- BBP Storage review
- Update Calendars
- Tom on NR products
Blocked:
- No
Followups:
- Director Candidate Practice
- UCVM meeting ()
- BBP Meeting ()
- CSEP Meeting ()
- CyberShake Meeting ()
- UCERF Meeting ()
- High-F Update
Pending:
- THJ and YC Call
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file