Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | *Refactored and tested vmesh gen code |
− | * | + | *Compared runtimes of GPU code with different size meshes - slower, more efficient on multiple-of-200 mesh |
− | * | + | *Queued CVM-H no GTL with 4 sites |
− | * | + | *Tried installing UCVM w/BBP 1D, tests failed |
− | * | + | *Tested performance of more CPUs for AWP - 50x50x50 is faster and more efficient |
+ | *Updated algorithm for synth runtimes | ||
+ | *Changed bookkeeping so that UCVM 1D model is tracked as "SCEC 1D", not HK | ||
+ | *Added BBP 1D to workflow and scripts | ||
== Today == | == Today == | ||
− | |||
− | |||
*Try 7x PP test on BW | *Try 7x PP test on BW | ||
− | * | + | *Check on curves with CVM-H, no GTL |
*Queue hazard curves with GPU, CPU code and CVM-S4.26 | *Queue hazard curves with GPU, CPU code and CVM-S4.26 | ||
*Continue preparing readiness review | *Continue preparing readiness review | ||
− | * | + | *Generate BBP 1D curves |
− | |||
− | |||
== Blocked == | == Blocked == | ||
Line 21: | Line 20: | ||
== Follow-ups == | == Follow-ups == | ||
− | * | + | *Summer School call |
+ | *High F call | ||
+ | *CyberShake calls | ||
== Areas of Responsibilities == | == Areas of Responsibilities == |
Revision as of 18:08, 28 January 2014
Yesterday
- Refactored and tested vmesh gen code
- Compared runtimes of GPU code with different size meshes - slower, more efficient on multiple-of-200 mesh
- Queued CVM-H no GTL with 4 sites
- Tried installing UCVM w/BBP 1D, tests failed
- Tested performance of more CPUs for AWP - 50x50x50 is faster and more efficient
- Updated algorithm for synth runtimes
- Changed bookkeeping so that UCVM 1D model is tracked as "SCEC 1D", not HK
- Added BBP 1D to workflow and scripts
Today
- Try 7x PP test on BW
- Check on curves with CVM-H, no GTL
- Queue hazard curves with GPU, CPU code and CVM-S4.26
- Continue preparing readiness review
- Generate BBP 1D curves
Blocked
- No
Follow-ups
- Summer School call
- High F call
- CyberShake calls
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration