Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Contact SRL editor |
− | * CyberShake | + | * Contact ED about EC project |
− | * | + | * Work with DG on 1D model for CyberShake |
− | * BBP | + | * Check with KO RG on Moho |
+ | * Check on BBP Storage Status | ||
+ | * Talk with EL | ||
== Today: == | == Today: == | ||
− | * | + | * PC feedback |
* DOE INCITE 2013 Final Report | * DOE INCITE 2013 Final Report | ||
− | * | + | * Send out Geo Call Announce |
− | |||
− | |||
* Confirm SI2 meeting | * Confirm SI2 meeting | ||
Line 17: | Line 17: | ||
== Followups: == | == Followups: == | ||
− | * | + | * |
== Pending: == | == Pending: == |
Revision as of 17:50, 30 January 2014
Contents
Yesterday:
- Contact SRL editor
- Contact ED about EC project
- Work with DG on 1D model for CyberShake
- Check with KO RG on Moho
- Check on BBP Storage Status
- Talk with EL
Today:
- PC feedback
- DOE INCITE 2013 Final Report
- Send out Geo Call Announce
- Confirm SI2 meeting
Blocked:
- No
Followups:
Pending:
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file