Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to search (→Today:) |
|||
Line 10: | Line 10: | ||
* PC feedback | * PC feedback | ||
* DOE INCITE 2013 Final Report | * DOE INCITE 2013 Final Report | ||
− | * Send out Geo Call Announce | + | * Send out Geo/SI2 Call Announce |
− | |||
* TTI one paper | * TTI one paper | ||
Line 21: | Line 20: | ||
== Pending: == | == Pending: == | ||
+ | * Confirm SI2 meeting | ||
* FW ABF into CME codebase | * FW ABF into CME codebase | ||
* Formalize the simulation plans for NR | * Formalize the simulation plans for NR |
Revision as of 17:57, 30 January 2014
Contents
Yesterday:
- Contact SRL editor
- Contact ED about EC project
- Work with DG on 1D model for CyberShake
- Check with KO RG on Moho
- Check on BBP Storage Status
- Talk with EL
Today:
- PC feedback
- DOE INCITE 2013 Final Report
- Send out Geo/SI2 Call Announce
- TTI one paper
Blocked:
- No
Followups:
- DG conversion from 1D file to UCVM 1D config
Pending:
- Confirm SI2 meeting
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file