Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 10: Line 10:
 
* PC feedback
 
* PC feedback
 
* DOE INCITE 2013 Final Report
 
* DOE INCITE 2013 Final Report
* Send out Geo Call Announce
+
* Send out Geo/SI2 Call Announce
* Confirm SI2 meeting
 
 
* TTI one paper
 
* TTI one paper
  
Line 21: Line 20:
  
 
== Pending: ==
 
== Pending: ==
 +
* Confirm SI2 meeting
 
* FW ABF into CME codebase
 
* FW ABF into CME codebase
 
* Formalize the simulation plans for NR
 
* Formalize the simulation plans for NR

Revision as of 17:57, 30 January 2014

Yesterday:

  • Contact SRL editor
  • Contact ED about EC project
  • Work with DG on 1D model for CyberShake
  • Check with KO RG on Moho
  • Check on BBP Storage Status
  • Talk with EL

Today:

  • PC feedback
  • DOE INCITE 2013 Final Report
  • Send out Geo/SI2 Call Announce
  • TTI one paper

Blocked:

  • No

Followups:

  • DG conversion from 1D file to UCVM 1D config

Pending:

  • Confirm SI2 meeting
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file