Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 4: | Line 4: | ||
* EC Discussion with TJ/ED | * EC Discussion with TJ/ED | ||
* Nvidia meeting at 1:30pm | * Nvidia meeting at 1:30pm | ||
+ | * Feedback on CS SR | ||
== Today: == | == Today: == |
Revision as of 18:17, 3 February 2014
Contents
Yesterday:
- PC feedback
- Send out Geo Call Announce
- EC Discussion with TJ/ED
- Nvidia meeting at 1:30pm
- Feedback on CS SR
Today:
- Schedule CS Science Review
- EC Draft Update
- TTI one pager
- INCITE 2013 Final Report Draft
- Send out Geo Call Announce
- Staff Meeting (2pm)
Blocked:
- No
Followups:
- BBP Med-term discussion
- Blue Waters Scheduled downtime
Pending:
- Confirm SI2 meeting
- CS parallelism discussion with SC
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file