Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Scheduled CS Science Review |
− | * | + | * EC Draft Update |
− | * | + | * INCITE 2013 Final Report Draft |
− | * | + | * Schedule High-F Call |
− | * | + | * Staff meeting |
== Today: == | == Today: == | ||
− | * | + | * INCITE Final Report Draft out |
− | * | + | * Web meeting (10:30am) |
− | * | + | * High-F Call (11am) |
− | + | * CyberShake Science Call (11:30am) | |
− | * Send out | + | * Blue Waters Metrics one-pager |
− | * | + | * Send out SEISM Call Announcement |
+ | * PC Final Reviews | ||
== Blocked: == | == Blocked: == | ||
Line 19: | Line 20: | ||
== Followups: == | == Followups: == | ||
* BBP Med-term discussion | * BBP Med-term discussion | ||
− | * | + | * UCVM Meeting Wed (9am) |
== Pending: == | == Pending: == |
Revision as of 17:59, 4 February 2014
Contents
Yesterday:
- Scheduled CS Science Review
- EC Draft Update
- INCITE 2013 Final Report Draft
- Schedule High-F Call
- Staff meeting
Today:
- INCITE Final Report Draft out
- Web meeting (10:30am)
- High-F Call (11am)
- CyberShake Science Call (11:30am)
- Blue Waters Metrics one-pager
- Send out SEISM Call Announcement
- PC Final Reviews
Blocked:
- No
Followups:
- BBP Med-term discussion
- UCVM Meeting Wed (9am)
Pending:
- Confirm SI2 meeting
- CS parallelism discussion with SC
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file