Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* 10:30am Web Call
+
* BBP Call
* 11am High-F Call
+
* UCVM Code Review
* 11:30am CyberShake Science Call
+
* Mira Access
* 12:00pm CyberShake Tech Call
 
* 1pm Admin Meeting
 
* 2pm YC Call
 
* Jun Zhou release signed and returned
 
  
 
== Today: ==
 
== Today: ==
* Storage call with MD (10:30am)
+
* Call with CG (1030am)
 +
* Call with RP (3pm)
 
* Arrange Travel to XAB
 
* Arrange Travel to XAB
 
* Travel to BW
 
* Travel to BW
* IRIS Presentation
 
* Schedule RP return call
 
* Setup Geo (GMSV) Call (Thursday 11am)
 
  
 
== Blocked: ==
 
== Blocked: ==
Line 24: Line 18:
  
 
== Pending: ==
 
== Pending: ==
* Call with AP (Thursday)
 
* Call with GMSV (Thursday)
 
 
* Create Storage Map for SCEC Storage (SC)
 
* Create Storage Map for SCEC Storage (SC)
 
* Slides for THJ CISE meeting
 
* Slides for THJ CISE meeting

Revision as of 23:19, 21 March 2014

Yesterday:

  • BBP Call
  • UCVM Code Review
  • Mira Access

Today:

  • Call with CG (1030am)
  • Call with RP (3pm)
  • Arrange Travel to XAB
  • Travel to BW

Blocked:

  • No

Followups:

  • CSEP Storage Purchase
  • Paper Planning

Pending:

  • Create Storage Map for SCEC Storage (SC)
  • Slides for THJ CISE meeting
  • Tech Paper Development
    • XTREME scaling
    • XSEDE Atlanta
    • BBP
  • Setup license meeting with Stevens USC
  • FW ABF into CME codebase
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Updated BBP and UCVM required docs to include "known problems" file