Difference between revisions of "ERI Workshop ToDo"
From SCECpedia
Jump to navigationJump to search(14 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Update Images == | == Update Images == | ||
− | |||
− | |||
− | |||
− | |||
'''Produce horizontal slices with corners | '''Produce horizontal slices with corners | ||
− | *121.0 32.0 | + | *-121.0 32.0 |
− | *114.0 36.0 | + | *-114.0 36.0 |
* Horizontal slices from CVM-H at depths | * Horizontal slices from CVM-H at depths | ||
** 0km | ** 0km | ||
Line 14: | Line 10: | ||
**20km | **20km | ||
**30km | **30km | ||
+ | |||
+ | |||
+ | '''Produce vertical cross sections''' | ||
+ | **0m to 30000m would be ok. (5km elevation, -35km elevation) | ||
+ | **Resolution is 500m horizontal, 100m vertical. | ||
+ | *S-N: from St. Monica Bay across LA basin into St. Monica Mts. into San Fernando basin into San Gabriel Mts. | ||
+ | **-118.45 33.8 | ||
+ | **-118.45 34.6 | ||
+ | *SW-NE: across center of LA basin into S.Gabriel Mts. | ||
+ | **-118.5 33.6 | ||
+ | **-117.8 34.2 | ||
+ | |||
'''Produce Vertical Profiles from sealevel to 30km''' | '''Produce Vertical Profiles from sealevel to 30km''' | ||
Line 27: | Line 35: | ||
**-118.23077628184646 | **-118.23077628184646 | ||
**34.25470454725538 | **34.25470454725538 | ||
− | |||
− | == | + | == Exercise Run-Time Estimates == |
+ | |||
+ | ============ | ||
+ | NR 5 stations | ||
+ | ============= | ||
+ | |||
+ | GP : 65m23.223s | ||
+ | SDSU : 79m39.141s | ||
+ | UCSB : 14m13.546s | ||
+ | |||
+ | |||
+ | == Preparation and Documentation Tasks == | ||
* time runs using windows image and post results | * time runs using windows image and post results | ||
+ | *instructions on how to extract velocity slice at 5km and then visualize (should be on wiki?). | ||
+ | * Surface Plugin with image draped over topography | ||
== SCEC-VDO Workshop Tasks Monday Sept 15== | == SCEC-VDO Workshop Tasks Monday Sept 15== | ||
* Check query by depth versus query by elevation | * Check query by depth versus query by elevation | ||
* Add GTL on or off option | * Add GTL on or off option | ||
− | |||
* Confirm UTM conversion issue in SCEC-VDO | * Confirm UTM conversion issue in SCEC-VDO | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Related Entries == | == Related Entries == | ||
*[[SCEC-ERI Workshop 2014]] | *[[SCEC-ERI Workshop 2014]] |
Latest revision as of 23:11, 25 September 2014
Contents
Update Images
Produce horizontal slices with corners
- -121.0 32.0
- -114.0 36.0
- Horizontal slices from CVM-H at depths
- 0km
- 2.5km
- 5km
- 10km
- 20km
- 30km
Produce vertical cross sections
- 0m to 30000m would be ok. (5km elevation, -35km elevation)
- Resolution is 500m horizontal, 100m vertical.
- S-N: from St. Monica Bay across LA basin into St. Monica Mts. into San Fernando basin into San Gabriel Mts.
- -118.45 33.8
- -118.45 34.6
- SW-NE: across center of LA basin into S.Gabriel Mts.
- -118.5 33.6
- -117.8 34.2
Produce Vertical Profiles from sealevel to 30km
- center of LA basin: 389202.929688 m, 3757530.875 m
- -118.19907888893411
- 33.95244598417918
- San Fernando basin: 366000 m, 3788000 m
- -118.45481546476057
- 34.22445042062638
- western San Gabriel Mts.: 386677.617188 m, 3791082.85938 m
- -118.23077628184646
- 34.25470454725538
Exercise Run-Time Estimates
============ NR 5 stations =============
GP : 65m23.223s SDSU : 79m39.141s UCSB : 14m13.546s
Preparation and Documentation Tasks
- time runs using windows image and post results
- instructions on how to extract velocity slice at 5km and then visualize (should be on wiki?).
- Surface Plugin with image draped over topography
SCEC-VDO Workshop Tasks Monday Sept 15
- Check query by depth versus query by elevation
- Add GTL on or off option
- Confirm UTM conversion issue in SCEC-VDO