Difference between revisions of "ERI Workshop ToDo"

From SCECpedia
Jump to navigationJump to search
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Update Images ==
 
== Update Images ==
* Add Sac Manual
 
* Add basement and moho turf files to image
 
* Add bbp2sac utility to Image
 
 
 
'''Produce horizontal slices with corners
 
'''Produce horizontal slices with corners
*121.0 32.0
+
*-121.0 32.0
*114.0 36.0
+
*-114.0 36.0
 
* Horizontal slices from CVM-H at depths
 
* Horizontal slices from CVM-H at depths
 
** 0km
 
** 0km
Line 14: Line 10:
 
**20km
 
**20km
 
**30km
 
**30km
 +
  
 
'''Produce vertical cross sections'''
 
'''Produce vertical cross sections'''
**0m to 30000m would be ok.  
+
**0m to 30000m would be ok. (5km elevation, -35km elevation)
 
**Resolution is 500m horizontal, 100m vertical.
 
**Resolution is 500m horizontal, 100m vertical.
 
*S-N: from St. Monica Bay across LA basin into St. Monica Mts. into San Fernando basin into San Gabriel Mts.
 
*S-N: from St. Monica Bay across LA basin into St. Monica Mts. into San Fernando basin into San Gabriel Mts.
**-118.513353,    33.855766 to -118.525812,    34.549975
+
**-118.45 33.8
**(UTM 360000 m, 3747000 m to 360000 m, 3824000 m)
+
**-118.45 34.6
 
*SW-NE: across center of LA basin into S.Gabriel Mts.
 
*SW-NE: across center of LA basin into S.Gabriel Mts.
**-118.464207,    33.653110  to -117.806954,    34.315512
+
**-118.5 33.6
**(UTM 364227.734375 m, 3724462.73438 m to 425753.648438 m, 3797239.53125 m)
+
**-117.8 34.2
  
  
Line 38: Line 35:
 
**-118.23077628184646
 
**-118.23077628184646
 
**34.25470454725538
 
**34.25470454725538
* Updated version of Virtual Box
+
 
 +
== Exercise Run-Time Estimates ==
 +
 
 +
============
 +
NR 5 stations
 +
=============
 +
 
 +
GP  : 65m23.223s
 +
SDSU : 79m39.141s
 +
UCSB : 14m13.546s
 +
 
  
 
== Preparation and Documentation Tasks ==
 
== Preparation and Documentation Tasks ==
Line 44: Line 51:
 
*instructions on how to extract velocity slice at 5km and then visualize (should be on wiki?).
 
*instructions on how to extract velocity slice at 5km and then visualize (should be on wiki?).
 
* Surface Plugin with image draped over topography
 
* Surface Plugin with image draped over topography
* Horizontal slices with negative depths
 
  
 
== SCEC-VDO Workshop Tasks Monday Sept 15==
 
== SCEC-VDO Workshop Tasks Monday Sept 15==

Latest revision as of 23:11, 25 September 2014

Update Images

Produce horizontal slices with corners

  • -121.0 32.0
  • -114.0 36.0
  • Horizontal slices from CVM-H at depths
    • 0km
    • 2.5km
    • 5km
    • 10km
    • 20km
    • 30km


Produce vertical cross sections

    • 0m to 30000m would be ok. (5km elevation, -35km elevation)
    • Resolution is 500m horizontal, 100m vertical.
  • S-N: from St. Monica Bay across LA basin into St. Monica Mts. into San Fernando basin into San Gabriel Mts.
    • -118.45 33.8
    • -118.45 34.6
  • SW-NE: across center of LA basin into S.Gabriel Mts.
    • -118.5 33.6
    • -117.8 34.2


Produce Vertical Profiles from sealevel to 30km

  • center of LA basin: 389202.929688 m, 3757530.875 m
    • -118.19907888893411
    • 33.95244598417918
  • San Fernando basin: 366000 m, 3788000 m
    • -118.45481546476057
    • 34.22445042062638
  • western San Gabriel Mts.: 386677.617188 m, 3791082.85938 m
    • -118.23077628184646
    • 34.25470454725538

Exercise Run-Time Estimates

============ 
NR 5 stations
=============
GP   : 65m23.223s 
SDSU : 79m39.141s
UCSB : 14m13.546s


Preparation and Documentation Tasks

  • time runs using windows image and post results
  • instructions on how to extract velocity slice at 5km and then visualize (should be on wiki?).
  • Surface Plugin with image draped over topography

SCEC-VDO Workshop Tasks Monday Sept 15

  • Check query by depth versus query by elevation
  • Add GTL on or off option
  • Confirm UTM conversion issue in SCEC-VDO

Related Entries