Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
 
(379 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday ==
+
== Current Items ==
*Summer School call
+
*Modify CyberShake to work on RSQSim ruptures
*OLCF User Call
+
**Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
*Modified map for CB
+
*CyberShake training
*Performed deterministic calculation for other 13 sites, sent to group with NGA results
+
*Update CyberShake study wiki pages to point to SQLite files
*Tested 1 Hz SGTs
+
*Create wiki page for CyberShake RSQSim, and upload sample seismograms
  
== Today ==
+
== Project Backlog ==
*Modify map for CB
+
*Run CyberShake post-processing on RSQSim events, once DB is populated
*Generate probabilistic response spectra plots, send to group
+
*Produce candidate site list for Bay Area CyberShake
*SGT test successful, queue full post-processing
+
*Investigate improved load-balancing for DirectSynth SGT handlers
*Paragraph to Phil about primary accomplishments on Titan in the last 3 months
+
*Experiment with OMP parallelization for post-processing
 
 
== Blocked ==
 
*No
 
 
 
== Follow-ups ==
 
*No
 
 
 
== Areas of Responsibilities ==
 
* CyberShake
 
* Broadband CyberShake
 
* Code migration
 

Latest revision as of 17:56, 1 February 2018

Current Items

  • Modify CyberShake to work on RSQSim ruptures
    • Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
  • CyberShake training
  • Update CyberShake study wiki pages to point to SQLite files
  • Create wiki page for CyberShake RSQSim, and upload sample seismograms

Project Backlog

  • Run CyberShake post-processing on RSQSim events, once DB is populated
  • Produce candidate site list for Bay Area CyberShake
  • Investigate improved load-balancing for DirectSynth SGT handlers
  • Experiment with OMP parallelization for post-processing