Difference between revisions of "Staff Priorities - Kevin"

From SCECpedia
Jump to navigationJump to search
 
(144 intermediate revisions by the same user not shown)
Line 1: Line 1:
5/19/15
+
8/23/16
  
 
== Yesterday: ==
 
== Yesterday: ==
* refactored rupture variation probability modification code to make it simpler/more intuitive
+
* met with Tom
* unit tests to verify approach
+
** needed help with SCEC-VDO figures for intern proposal
* need to further investigate issues with bumping up RV probabilities by a large amount in OEF scenarios as opposed to adding additional sources
+
* worked on transparent polygon render order in VTK, not yet successful
* responded to UCERF3 questions from Feng
+
* CyberShake call
* skyped with Ned on USGS web service clients and needs for aftershock filter
+
* UCERF3 Science paper figure work:
 +
** Finished SCEC-VDO figure work, generated first draft of all Mojave M7 SCEC-VDO figures
 +
** discovered that 10k Mojave M7 simulations isn't enough for stable spatial distribution of probability gain. Submitted more calcs at Stampede which ran over the weekend, now up to 100k
  
 
== Today: ==
 
== Today: ==
* launch new ETAS calcs for Ned
+
* work on web location for UCERF3-ETAS simulations:
* book Prague travel with Deb
+
** one location that includes only the "final" simulations
* respond to more UCERF3 questions from Feng
+
** add descriptions of plots, hide plots not featured in paper
* work on RV probability modification - should large increases be treated as separate source?
+
** will be similar to: http://opensha.usc.edu/ftp/UCERF3.3/
* check out USGS event webservice client from git, start updating to v1.0 specifications
+
* meet with Tom
* look at nightly unit test failure
+
* UCERF3 Science paper figure work:
 +
** stage back, merge 100k Mojave M7 simulations, redo plots
 +
** likely plot updates after meeting with Tom
 +
* work on figures for loss modeling paper
  
 
== Blocked: ==
 
== Blocked: ==
Line 20: Line 25:
  
 
== Followups: ==
 
== Followups: ==
no
+
Tom
 +
 
 +
== Lower priority or longer term tasks ==
 +
* once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3

Latest revision as of 17:10, 23 August 2016

8/23/16

Yesterday:

  • met with Tom
    • needed help with SCEC-VDO figures for intern proposal
  • worked on transparent polygon render order in VTK, not yet successful
  • CyberShake call
  • UCERF3 Science paper figure work:
    • Finished SCEC-VDO figure work, generated first draft of all Mojave M7 SCEC-VDO figures
    • discovered that 10k Mojave M7 simulations isn't enough for stable spatial distribution of probability gain. Submitted more calcs at Stampede which ran over the weekend, now up to 100k

Today:

  • work on web location for UCERF3-ETAS simulations:
  • meet with Tom
  • UCERF3 Science paper figure work:
    • stage back, merge 100k Mojave M7 simulations, redo plots
    • likely plot updates after meeting with Tom
  • work on figures for loss modeling paper

Blocked:

no

Followups:

Tom

Lower priority or longer term tasks

  • once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3