Difference between revisions of "Staff Priorities - Kevin"

From SCECpedia
Jump to navigationJump to search
 
(125 intermediate revisions by the same user not shown)
Line 1: Line 1:
7/28/15
+
8/23/16
  
 
== Yesterday: ==
 
== Yesterday: ==
* listened in on Project 17 call
+
* met with Tom
* exported simulator moment rate time series to matlab for spectral analysis
+
** needed help with SCEC-VDO figures for intern proposal
* re-read notes from my data analysis class on spectral analysis
+
* worked on transparent polygon render order in VTK, not yet successful
* generated FFT amplitude and Welch's power spectrum plots for simulator data which show that the observed 200 year periodicity in moment rate is not an artifact of the moment rate averaging method
+
* CyberShake call
 +
* UCERF3 Science paper figure work:
 +
** Finished SCEC-VDO figure work, generated first draft of all Mojave M7 SCEC-VDO figures
 +
** discovered that 10k Mojave M7 simulations isn't enough for stable spatial distribution of probability gain. Submitted more calcs at Stampede which ran over the weekend, now up to 100k
  
 
== Today: ==
 
== Today: ==
* meet with Tom on simulator moment rate analysis and potential AGU abstract
+
* work on web location for UCERF3-ETAS simulations:
* read papers on synchronization from Tom
+
** one location that includes only the "final" simulations
** implement new simulator synchronization plot method that Tom found
+
** add descriptions of plots, hide plots not featured in paper
* generate synthetic UCERF3-TD based catalogs and apply moment rate spectral analysis to compare with simulator
+
** will be similar to: http://opensha.usc.edu/ftp/UCERF3.3/
 +
* meet with Tom
 +
* UCERF3 Science paper figure work:
 +
** stage back, merge 100k Mojave M7 simulations, redo plots
 +
** likely plot updates after meeting with Tom
 +
* work on figures for loss modeling paper
  
 
== Blocked: ==
 
== Blocked: ==
Line 17: Line 25:
  
 
== Followups: ==
 
== Followups: ==
no
+
Tom
 
 
 
 
  
 
== Lower priority or longer term tasks ==
 
== Lower priority or longer term tasks ==
* Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
+
* once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3

Latest revision as of 17:10, 23 August 2016

8/23/16

Yesterday:

  • met with Tom
    • needed help with SCEC-VDO figures for intern proposal
  • worked on transparent polygon render order in VTK, not yet successful
  • CyberShake call
  • UCERF3 Science paper figure work:
    • Finished SCEC-VDO figure work, generated first draft of all Mojave M7 SCEC-VDO figures
    • discovered that 10k Mojave M7 simulations isn't enough for stable spatial distribution of probability gain. Submitted more calcs at Stampede which ran over the weekend, now up to 100k

Today:

  • work on web location for UCERF3-ETAS simulations:
  • meet with Tom
  • UCERF3 Science paper figure work:
    • stage back, merge 100k Mojave M7 simulations, redo plots
    • likely plot updates after meeting with Tom
  • work on figures for loss modeling paper

Blocked:

no

Followups:

Tom

Lower priority or longer term tasks

  • once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3