10/12/15
+
8/23/16
  
 
== Yesterday: ==
 
== Yesterday: ==
* finished wrapper for Garcia regions perl script for now since USGS webservice that we want to use eventually is on an internal webservice
+
* met with Tom
* created fetcher for default ETAS parameters using Garcia region fetcher and data from Morgan
+
** needed help with SCEC-VDO figures for intern proposal
* updated parallel ETAS code to work with Ned's latest changes
+
* worked on transparent polygon render order in VTK, not yet successful
* launched jobs on Stampede and babysat over the weekend. Went over disk quota Saturday but was able to clear out space
+
* CyberShake call
 +
* UCERF3 Science paper figure work:
 +
** Finished SCEC-VDO figure work, generated first draft of all Mojave M7 SCEC-VDO figures
 +
** discovered that 10k Mojave M7 simulations isn't enough for stable spatial distribution of probability gain. Submitted more calcs at Stampede which ran over the weekend, now up to 100k
  
 
== Today: ==
 
== Today: ==
* post process weekend ETAS runs for Ned, push through remaining calcs
+
* work on web location for UCERF3-ETAS simulations:
* respond to Phil's XSEDE allocation request
+
** one location that includes only the "final" simulations
* incorporate default ETAS parameters/Garcia region fetching into OAF application
+
** add descriptions of plots, hide plots not featured in paper
** post jar and send link to Morgan/Ned/Jeanne
+
** will be similar to: http://opensha.usc.edu/ftp/UCERF3.3/
 +
* meet with Tom
 +
* UCERF3 Science paper figure work:
 +
** stage back, merge 100k Mojave M7 simulations, redo plots
 +
** likely plot updates after meeting with Tom
 +
* work on figures for loss modeling paper
  
 
== Blocked: ==
 
== Blocked: ==
Line 17: Line 25:
  
 
== Followups: ==
 
== Followups: ==
no
+
Tom
 
 
  
 
== Lower priority or longer term tasks ==
 
== Lower priority or longer term tasks ==
* Fill in missing site/rupture distances in CyberShake DB for ERF 36 (200m)
+
* once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3
* finish mapping of historical earthquakes to UCERF3 ruptures in order to run ETAS simulations of aftershock sequences
 

Latest revision as of 17:10, 23 August 2016

8/23/16

Yesterday:

  • met with Tom
    • needed help with SCEC-VDO figures for intern proposal
  • worked on transparent polygon render order in VTK, not yet successful
  • CyberShake call
  • UCERF3 Science paper figure work:
    • Finished SCEC-VDO figure work, generated first draft of all Mojave M7 SCEC-VDO figures
    • discovered that 10k Mojave M7 simulations isn't enough for stable spatial distribution of probability gain. Submitted more calcs at Stampede which ran over the weekend, now up to 100k

Today:

  • work on web location for UCERF3-ETAS simulations:
  • meet with Tom
  • UCERF3 Science paper figure work:
    • stage back, merge 100k Mojave M7 simulations, redo plots
    • likely plot updates after meeting with Tom
  • work on figures for loss modeling paper

Blocked:

no

Followups:

Tom

Lower priority or longer term tasks

  • once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3