2/23/16
+
8/23/16
  
 
== Yesterday: ==
 
== Yesterday: ==
* responded to CyberShake disaggregation/hazard curve calculation questions from Nenad
+
* met with Tom
* ETAS work
+
** needed help with SCEC-VDO figures for intern proposal
** got scenario simulation plots working
+
* worked on transparent polygon render order in VTK, not yet successful
** discovered issue with ID of scenario rupture, modified code to make scenario rupture always ID 0
+
* CyberShake call
** investigated time zone issues - simulations were starting at noon instead of midnight
+
* UCERF3 Science paper figure work:
** verified that input historical earthquake catalog is UTC
+
** Finished SCEC-VDO figure work, generated first draft of all Mojave M7 SCEC-VDO figures
** determined that it was daylight savings time issue
+
** discovered that 10k Mojave M7 simulations isn't enough for stable spatial distribution of probability gain. Submitted more calcs at Stampede which ran over the weekend, now up to 100k
** configured more scenario simulations, submitted at Stampede
 
* responded to question from Rundle's group, generated geometry file with different sorting. They might be asking for something more difficult, but hopefully this satisfies the request.
 
  
 
== Today: ==
 
== Today: ==
* ETAS work:
+
* work on web location for UCERF3-ETAS simulations:
** fix bug with runs overnight and resubmit
+
** one location that includes only the "final" simulations
** work on getting all scenario based plots down to M2.5 (currently M4). First try filtering out spontaneous events, might be small enough. Then move to bigger machine if that doesn't work
+
** add descriptions of plots, hide plots not featured in paper
** babysit runs on stampede and submit more when jobs push through
+
** will be similar to: http://opensha.usc.edu/ftp/UCERF3.3/
* continue new opensha transition
+
* meet with Tom
** recompile WG02 ERF and set up wrapper
+
* UCERF3 Science paper figure work:
** get coverage tests working
+
** stage back, merge 100k Mojave M7 simulations, redo plots
* more followup questions from Nenad on CyberShake curve/disagg calculation
+
** likely plot updates after meeting with Tom
 +
* work on figures for loss modeling paper
  
 
== Blocked: ==
 
== Blocked: ==
Line 26: Line 25:
  
 
== Followups: ==
 
== Followups: ==
no
+
Tom
  
 
== Lower priority or longer term tasks ==
 
== Lower priority or longer term tasks ==
 
* once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3
 
* once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3
* wiki page for web services
 
* continue to figure out bug with site amplification implementation, fix unit tests
 

Latest revision as of 17:10, 23 August 2016

8/23/16

Yesterday:

  • met with Tom
    • needed help with SCEC-VDO figures for intern proposal
  • worked on transparent polygon render order in VTK, not yet successful
  • CyberShake call
  • UCERF3 Science paper figure work:
    • Finished SCEC-VDO figure work, generated first draft of all Mojave M7 SCEC-VDO figures
    • discovered that 10k Mojave M7 simulations isn't enough for stable spatial distribution of probability gain. Submitted more calcs at Stampede which ran over the weekend, now up to 100k

Today:

  • work on web location for UCERF3-ETAS simulations:
  • meet with Tom
  • UCERF3 Science paper figure work:
    • stage back, merge 100k Mojave M7 simulations, redo plots
    • likely plot updates after meeting with Tom
  • work on figures for loss modeling paper

Blocked:

no

Followups:

Tom

Lower priority or longer term tasks

  • once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3