* ETAS work
+
* met with Tom
** fixed bug with runs overnight and resubmitted
+
** needed help with SCEC-VDO figures for intern proposal
** redid analysis for all scenario simulations down to M2.5 (previously M4). Filtering out spontaneous events in binary files worked prior to analysis
+
* worked on transparent polygon render order in VTK, not yet successful
* viz meeting
+
* CyberShake call
* opensha server transition - almost there!
+
* UCERF3 Science paper figure work:
** got WG02 ERF compiled and wrapper working
+
** Finished SCEC-VDO figure work, generated first draft of all Mojave M7 SCEC-VDO figures
** got last cruise control build running: nightly tests & code coverage, app launch tests working with Xvfb
+
** discovered that 10k Mojave M7 simulations isn't enough for stable spatial distribution of probability gain. Submitted more calcs at Stampede which ran over the weekend, now up to 100k
  
 
== Today: ==
 
== Today: ==
* ETAS work:
+
* work on web location for UCERF3-ETAS simulations:
** babysit runs on stampede and submit more when jobs push through
+
** one location that includes only the "final" simulations
** move run analysis to new SCEC server
+
** add descriptions of plots, hide plots not featured in paper
* continue new opensha transition
+
** will be similar to: http://opensha.usc.edu/ftp/UCERF3.3/
** trac and website issues
+
* meet with Tom
* work on CyberShake hazard curve/disagg code and wiki page for users (specifically Nenad)
+
* UCERF3 Science paper figure work:
 +
** stage back, merge 100k Mojave M7 simulations, redo plots
 +
** likely plot updates after meeting with Tom
 +
* work on figures for loss modeling paper
  
 
== Blocked: ==
 
== Blocked: ==
Line 22: Line 25:
  
 
== Followups: ==
 
== Followups: ==
no
+
Tom
  
 
== Lower priority or longer term tasks ==
 
== Lower priority or longer term tasks ==
 
* once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3
 
* once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3
* wiki page for web services
 
* continue to figure out bug with site amplification implementation, fix unit tests
 

Latest revision as of 17:10, 23 August 2016

8/23/16

Yesterday:

  • met with Tom
    • needed help with SCEC-VDO figures for intern proposal
  • worked on transparent polygon render order in VTK, not yet successful
  • CyberShake call
  • UCERF3 Science paper figure work:
    • Finished SCEC-VDO figure work, generated first draft of all Mojave M7 SCEC-VDO figures
    • discovered that 10k Mojave M7 simulations isn't enough for stable spatial distribution of probability gain. Submitted more calcs at Stampede which ran over the weekend, now up to 100k

Today:

  • work on web location for UCERF3-ETAS simulations:
  • meet with Tom
  • UCERF3 Science paper figure work:
    • stage back, merge 100k Mojave M7 simulations, redo plots
    • likely plot updates after meeting with Tom
  • work on figures for loss modeling paper

Blocked:

no

Followups:

Tom

Lower priority or longer term tasks

  • once new server is finished, add page on UCERF3-TD supplement corrections and add bullet linking to it from http://www.wgcep.org/UCERF3