Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to search(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | * Looked for obs data for NR event |
− | * | + | ** Forward station list table to CG |
− | * | + | * Mtg with CG regarding BBP issues |
− | * | + | * Site response changes |
+ | ** Surveyed current site response methods on BBP | ||
+ | ** Make available to all methods | ||
== Today == | == Today == | ||
− | * | + | * Finish site response changes |
− | * | + | ** Maintain existing workflow |
− | * | + | ** Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM |
− | * | + | * Update wiki page for multi-segment ruptures |
+ | ** Add diagram | ||
+ | * Review High-F package from SA | ||
== Blocked: == | == Blocked: == | ||
Line 19: | Line 23: | ||
== Followups: == | == Followups: == | ||
− | * | + | * No |
== To Do: == | == To Do: == | ||
Line 28: | Line 32: | ||
* BBP Code updates needed before git migration | * BBP Code updates needed before git migration | ||
− | |||
** Move to argparse | ** Move to argparse | ||
** Simplify tests to use smaller files | ** Simplify tests to use smaller files | ||
Line 38: | Line 41: | ||
** Run tests: 2 days | ** Run tests: 2 days | ||
** Review results: 2 days | ** Review results: 2 days | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== Medium Term === | === Medium Term === |
Latest revision as of 17:48, 26 September 2016
Contents
Yesterday
- Looked for obs data for NR event
- Forward station list table to CG
- Mtg with CG regarding BBP issues
- Site response changes
- Surveyed current site response methods on BBP
- Make available to all methods
Today
- Finish site response changes
- Maintain existing workflow
- Need to run differently for GP/IRIKURA/SONG versus SDSU/UCSB/EXSIM
- Update wiki page for multi-segment ruptures
- Add diagram
- Review High-F package from SA
Blocked:
- No
Followups:
- No
To Do:
Short Term
Broadband Platform
- BBP Code updates needed before git migration
- Move to argparse
- Simplify tests to use smaller files
- Remove unused data files in tests directory
- NGA-West 2 validation on BBP - Total: 6 days
- Contact CG, collect input scenarios: 1 day
- Write test code: 1 day
- Run tests: 2 days
- Review results: 2 days
Medium Term
- Package GF generation code from RG into BBP Platform
- New raytracing code for SDSU method
- Update Anderson method
- BBP Projects
- Try logging into Gordon