Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
 
(118 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday ==
+
== Current Items ==
*Worked on intern HPC presentation
+
*Modify CyberShake to work on RSQSim ruptures
*Updated DB migration plan
+
**Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
*Matched mentors and mentees for IHPCSS
+
*CyberShake training
 +
*Update CyberShake study wiki pages to point to SQLite files
 +
*Create wiki page for CyberShake RSQSim, and upload sample seismograms
  
== Today ==
+
== Project Backlog ==
*Resubmit seismogram synthesis, see if seg fault disappears
+
*Run CyberShake post-processing on RSQSim events, once DB is populated
*Edit IHPCSS mentoring docs
+
*Produce candidate site list for Bay Area CyberShake
*Update Study 15.12 wiki
+
*Investigate improved load-balancing for DirectSynth SGT handlers
*Customize SCEC-VDO navigation
+
*Experiment with OMP parallelization for post-processing
*Run a few tests to determine what to do with old CyberShake studies to move them off production
 
*Update wiki with CyberShake specification template
 
*Update wiki with process for defining CyberShake box
 
*Create dummy sites at box corners; determine volume size
 
*Get CyberShake estimates for INCITE proposal: CCSP for 900 m/s and 500 m/s, 1 Hz; also So Cal with UCERF 3 tests
 
 
 
== Blocked ==
 
*No
 
 
 
== Follow-ups ==
 
*No
 
 
 
== Areas of Responsibilities ==
 
* CyberShake
 
* Broadband CyberShake
 
* Code migration
 

Latest revision as of 17:56, 1 February 2018

Current Items

  • Modify CyberShake to work on RSQSim ruptures
    • Modify PreSGT step to determine list of points to save SGTs for from RSQSim rupture files
  • CyberShake training
  • Update CyberShake study wiki pages to point to SQLite files
  • Create wiki page for CyberShake RSQSim, and upload sample seismograms

Project Backlog

  • Run CyberShake post-processing on RSQSim events, once DB is populated
  • Produce candidate site list for Bay Area CyberShake
  • Investigate improved load-balancing for DirectSynth SGT handlers
  • Experiment with OMP parallelization for post-processing