Difference between revisions of "Talk:CSEP Working Group"
From SCECpedia
Jump to navigationJump to search (Created page with "==5 Year Plan==") |
|||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | ==5 Year Plan== | + | ==CSEP2: 5-Year Plan== |
+ | (Items listed in no particular order) | ||
+ | * Develop relationships with users | ||
+ | * Outreach | ||
+ | * Curated CSEP1 data set | ||
+ | * Evaluating simulation-based forecasts | ||
+ | * Ensemble models | ||
+ | * Fault-based forcasts | ||
+ | * Removing Poisson Assumption | ||
+ | * Improve code-base to be more flexible | ||
+ | * Including ground motions | ||
+ | ** GMPE | ||
+ | ** Simulation Based (i.e. BBP) |
Latest revision as of 22:14, 14 February 2018
CSEP2: 5-Year Plan
(Items listed in no particular order)
- Develop relationships with users
- Outreach
- Curated CSEP1 data set
- Evaluating simulation-based forecasts
- Ensemble models
- Fault-based forcasts
- Removing Poisson Assumption
- Improve code-base to be more flexible
- Including ground motions
- GMPE
- Simulation Based (i.e. BBP)