Difference between revisions of "UCVM Workshop July 2011"

From SCECpedia
Jump to navigationJump to search
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
== Workshop July 2011 ==
 
== Workshop July 2011 ==
  
 +
SCEC is coordinating a California Velocity Model development workshop for the week of 25 July, 2011. Workshop calls are typically 90 minutes in length. Please send agenda suggestions to Phil Maechling or Tran Huynh.
 +
 +
*Date: Thursday, July 28, 2011
 +
*Time: 1:30 PM - 3:00 PM Pacific Time
 +
*[https://college.usc.edu/scecconnect Shared Desktop]
 +
 +
== Presentation Material ==
 +
 +
Power-point presentations:
 +
 +
* [http://earth.usc.edu/~patrices/presentations/scec_ucvm_sw_design.ppt UCVM S/W Design]
 +
* [http://earth.usc.edu/~patrices/presentations/scec_ucvm_tools.ppt UCVM-based Tools]
 +
 +
== Proposed Workshop Agenda ==
  
 
#UCVM Software Design
 
#UCVM Software Design
Line 6: Line 20:
 
##Standardized query interface
 
##Standardized query interface
 
##How UCVM supports queries for non-standard models (e.g. How does UCVM handle elevation query using CVM-S4 (no elevation model)
 
##How UCVM supports queries for non-standard models (e.g. How does UCVM handle elevation query using CVM-S4 (no elevation model)
 
 
#Selected standardized statewide properties including:
 
#Selected standardized statewide properties including:
 
##Topography
 
##Topography
Line 12: Line 25:
 
##Statewide Geotechnical layer from Vs30 and Wald Vs30 topography relationship
 
##Statewide Geotechnical layer from Vs30 and Wald Vs30 topography relationship
 
##Georeference standardization
 
##Georeference standardization
 
 
#Selected UCM Coverage Region:
 
#Selected UCM Coverage Region:
 
##Discuss portability of UCVM other regions including Central US
 
##Discuss portability of UCVM other regions including Central US
 
 
#Currently Supported Models
 
#Currently Supported Models
 
##CVM-S4
 
##CVM-S4
Line 24: Line 35:
 
##Graves Northern Cal
 
##Graves Northern Cal
 
##Lin Thurber statewide
 
##Lin Thurber statewide
 
 
#Requirements for Hosted Models
 
#Requirements for Hosted Models
 
##query interface
 
##query interface
 
##projection definition
 
##projection definition
 
 
#Options for storing hosted CVMS
 
#Options for storing hosted CVMS
 
##GTL etree
 
##GTL etree
Line 35: Line 44:
 
##Lin-Thurber tables
 
##Lin-Thurber tables
 
##Po Chen CVM-SI mesh
 
##Po Chen CVM-SI mesh
 
 
#Support for HPC creation of Large Meshes by UCVM
 
#Support for HPC creation of Large Meshes by UCVM
 
##parallel query capabilities
 
##parallel query capabilities
 
##large mesh making capabilities
 
##large mesh making capabilities
 
 
#ETREE support
 
#ETREE support
 
##Description of etree import and export by UCVM
 
##Description of etree import and export by UCVM
 
 
 
#CVM Differencing capabilities
 
#CVM Differencing capabilities
 
##Example differences between CVM-S4 and CVM-SI
 
##Example differences between CVM-S4 and CVM-SI
 
##Proposed differencing tools
 
##Proposed differencing tools
 
##Other CVM differences of interest
 
##Other CVM differences of interest
 
 
#CVM Evaluation System Design
 
#CVM Evaluation System Design
 
##Evaluation using point sources
 
##Evaluation using point sources
Line 54: Line 58:
 
##Goodness of fit measures in use
 
##Goodness of fit measures in use
 
##Proposed GOF measures to be used
 
##Proposed GOF measures to be used
 
 
#Evaluation results for 3 events
 
#Evaluation results for 3 events
 
##Evaluate sensitivity of current evaluation system using 3 events and 3 CVM’s
 
##Evaluate sensitivity of current evaluation system using 3 events and 3 CVM’s
 
##Chino Hills,Gilroy, Oakland and CVM-H, CVM-S4, CenCal
 
##Chino Hills,Gilroy, Oakland and CVM-H, CVM-S4, CenCal
 +
 +
== Related Entries ==
 +
*[[UCVM]]
 +
*[[Community Velocity Model]]
 +
*[[IDV]]

Latest revision as of 16:39, 28 July 2011

Workshop July 2011

SCEC is coordinating a California Velocity Model development workshop for the week of 25 July, 2011. Workshop calls are typically 90 minutes in length. Please send agenda suggestions to Phil Maechling or Tran Huynh.

  • Date: Thursday, July 28, 2011
  • Time: 1:30 PM - 3:00 PM Pacific Time
  • Shared Desktop

Presentation Material

Power-point presentations:

Proposed Workshop Agenda

  1. UCVM Software Design
    1. Framework for hosting multiple CVMs
    2. Standardized query interface
    3. How UCVM supports queries for non-standard models (e.g. How does UCVM handle elevation query using CVM-S4 (no elevation model)
  2. Selected standardized statewide properties including:
    1. Topography
    2. Bathymetry
    3. Statewide Geotechnical layer from Vs30 and Wald Vs30 topography relationship
    4. Georeference standardization
  3. Selected UCM Coverage Region:
    1. Discuss portability of UCVM other regions including Central US
  4. Currently Supported Models
    1. CVM-S4
    2. CVM-SI
    3. CVM-H 11.2
    4. CVM-H 6.3
    5. CenCal USGS
    6. Graves Northern Cal
    7. Lin Thurber statewide
  5. Requirements for Hosted Models
    1. query interface
    2. projection definition
  6. Options for storing hosted CVMS
    1. GTL etree
    2. CVM-S4 objects
    3. CVM-H gocad
    4. Lin-Thurber tables
    5. Po Chen CVM-SI mesh
  7. Support for HPC creation of Large Meshes by UCVM
    1. parallel query capabilities
    2. large mesh making capabilities
  8. ETREE support
    1. Description of etree import and export by UCVM
  9. CVM Differencing capabilities
    1. Example differences between CVM-S4 and CVM-SI
    2. Proposed differencing tools
    3. Other CVM differences of interest
  10. CVM Evaluation System Design
    1. Evaluation using point sources
    2. Evaluation using large historical events
    3. Goodness of fit measures in use
    4. Proposed GOF measures to be used
  11. Evaluation results for 3 events
    1. Evaluate sensitivity of current evaluation system using 3 events and 3 CVM’s
    2. Chino Hills,Gilroy, Oakland and CVM-H, CVM-S4, CenCal

Related Entries