Difference between revisions of "Broadband Sprints"
From SCECpedia
Jump to navigationJump to search(118 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | Development targets, Trac Tickets, and other activities related to Broadband Platform development | + | Development targets, Trac Tickets, and other activities related to Broadband Platform development. In these planning, Level of Effort (LOE) is defined in days. |
+ | |||
+ | == Create BBP v12.10 Distribution == | ||
+ | #Confirm SDSU results (cvm used,default kappa value,fault geom file) | ||
+ | #Confirm GP, UCSB, SDSU work on server and HPCC | ||
+ | #Confirm seismogram duration of 100seconds | ||
+ | #Complete data product improvements including (use RotD50 not avg horizontal) | ||
+ | #Compile list of Broadband data products and add to users guide | ||
+ | #Update Installation instructions | ||
+ | #Update User Guide with details on processing pipeline | ||
+ | #Update manifest in distribution | ||
+ | #Tag svn with version number for distribution | ||
+ | #Post new distribution files using download tracking | ||
+ | |||
+ | == Sprint 7 == | ||
+ | *Sprint Dates: 24 Sept - 5 Oct | ||
+ | {| class="wikitable" style="text-align: center; border="1" | ||
+ | |- | ||
+ | !Priority !! Sprint Task !! Estimated LOE !! % Completed !! Vel. Pts | ||
+ | |- | ||
+ | |1 || Integration of the new bbtoolbox model || 5 || 80 || 4.0 | ||
+ | |- | ||
+ | |2 || Modeler access to cluster || 1 || 10 || 0.1 | ||
+ | |- | ||
+ | |3 || Release candidate distribution for v12.10 || 3 || 10 || 0.3 | ||
+ | |- | ||
+ | |4 || Match simulation results between server and cluster || 2 || 66 || 1.3 | ||
+ | |- | ||
+ | |5 || Generate first set of 50 realizations for LOMAP || 2 || 66 || 1.3 | ||
+ | |- | ||
+ | |6 || Install bbp software usable on server and cluster || 3 || 0 || 0 | ||
+ | |- | ||
+ | |7 || Data products list generated for validation runs || 2 || 0 || 0 | ||
+ | |- | ||
+ | |8 || Calculate SI2 BBP Metrics || 1 || 10 || 0.1 | ||
+ | |- | ||
+ | |9 || BBP input to EXSIM input config generator || 2 || 10 || 0.2 | ||
+ | |- | ||
+ | |10 || Use low and high frequency limits on bias plots || 2 || 100 || 2 | ||
+ | |- | ||
+ | |11 || Use RotD50 data on bias plot || 2 || 50 || 1 | ||
+ | |- | ||
+ | | || Total Sprint Velocity || 19 || || 10.3 | ||
+ | |} | ||
+ | |||
+ | == Sprint 6 == | ||
+ | *Sprint Dates: 10 Sept - 21 Sept | ||
+ | |||
+ | {| class="wikitable" style="text-align: center; border="1" | ||
+ | |- | ||
+ | !Priority !! Sprint Task !! Estimated LOE !! % Completed !! Vel Pts | ||
+ | |- | ||
+ | |1 || Implementation of the Arias duration GOF plots || 3 || 100 || 3.00 | ||
+ | |- | ||
+ | |2 || Integration of new bbtoolbox model || 5 || 30 || 1.50 | ||
+ | |- | ||
+ | |3 || Develop scripts to run bbp on cluster || 5 || 95 || 4.75 | ||
+ | |- | ||
+ | | || Total Sprint Velocity || 13|| || 9.25 | ||
+ | |} | ||
+ | |||
+ | == Sprint 5 == | ||
+ | *Sprint Dates - 27 August - 7 Sept | ||
+ | #Calculate velocity profiles (Vp,Vs,rho) for all California validation events | ||
+ | #Configure bbp to run on server or cluster | ||
+ | #Add Arias duration into validation pipeline | ||
+ | #Add Site Correction Module into validation pipeline | ||
+ | #End-to-end validation pipeline with both obs and sim processing | ||
+ | #Integrate new bbtoolbox codes into pipeline | ||
+ | #Configure UCSB and SDSU methods to run LOMAP | ||
+ | #Fill out 6 panel bias plots based on 3 methods running on server and cluster | ||
+ | #Install bbp software usable on server and cluster | ||
+ | #Prepare Broadband 12.8.0 Release, including: | ||
+ | ##Run full validation tests for three main methods run on both server and cluster. | ||
+ | ##Produce 12.8.0 distributions of validation and velocity model packages | ||
+ | ##Update Documentation including Installation and User Guide | ||
+ | |||
+ | == Sprint 4 == | ||
+ | * Sprint Dates - 13 August - 24 August | ||
+ | #Calculate velocity profiles for Landers and Hector Mine station sites | ||
+ | #Configure UCSB and SDSU methods to run LOMAP | ||
+ | #Post bias plots for LOMAP for 3 main methods on server and on cluster | ||
+ | #Add method that raises uncatchable exception to bbp_utils to identify unexpected conditions | ||
+ | #Add arias duration into validation pipeline | ||
+ | #Add rotd50 into validation pipeline | ||
+ | #Check rotd50 results from platform against results from CG | ||
+ | #Add site correction module to process observed seismograms | ||
+ | #Add observation data processing into validation pipeline | ||
+ | #End-to-end validation pipeline with both obs and sim processing. | ||
+ | #Data products list generated for validation runs. | ||
+ | #Make site response processing optional for validation runs | ||
+ | #Update GP codebase with compiler changes | ||
+ | #Prepare Broadband 12.8.0 Release | ||
+ | ##Run full validation tests for three main methods run on both server and cluster. | ||
+ | ##Produce 12.8.0 distributions of validation and velocity model packages | ||
+ | ##Update Documentation including Installation and User Guide | ||
== Sprint 3 == | == Sprint 3 == | ||
Line 16: | Line 111: | ||
== Sprint 2 == | == Sprint 2 == | ||
* Sprint Dates: 16 July - 27 July | * Sprint Dates: 16 July - 27 July | ||
− | + | {| class="wikitable" style="text-align: center; border="1" | |
+ | |- | ||
+ | !Priority !! Sprint Task !! Estimated LOE !! % Complete !! Vel. Pts | ||
+ | |- | ||
+ | |1 || Change validation processing so users specify GF used in processing || 10 || 100 || 10 | ||
+ | |- | ||
+ | | || Total Sprint Velocity || 10 || || 10 | ||
+ | |} | ||
== Sprint 1 == | == Sprint 1 == | ||
* Sprint Dates: 2 July - 13 July | * Sprint Dates: 2 July - 13 July | ||
− | + | {| class="wikitable" style="text-align: center; border="1" | |
+ | |- | ||
+ | !Priority !! Sprint Task !! Estimated LOE !! % Complete !! Vel. Pts | ||
+ | |- | ||
+ | |1 || Separate Validation Data from BBP software distribution || 10 || 100 || 10.0 | ||
+ | |- | ||
+ | | || Total Sprint Velocity || 10 || || 10.0 | ||
+ | |} |
Latest revision as of 23:42, 8 October 2012
Development targets, Trac Tickets, and other activities related to Broadband Platform development. In these planning, Level of Effort (LOE) is defined in days.
Contents
Create BBP v12.10 Distribution
- Confirm SDSU results (cvm used,default kappa value,fault geom file)
- Confirm GP, UCSB, SDSU work on server and HPCC
- Confirm seismogram duration of 100seconds
- Complete data product improvements including (use RotD50 not avg horizontal)
- Compile list of Broadband data products and add to users guide
- Update Installation instructions
- Update User Guide with details on processing pipeline
- Update manifest in distribution
- Tag svn with version number for distribution
- Post new distribution files using download tracking
Sprint 7
- Sprint Dates: 24 Sept - 5 Oct
Priority | Sprint Task | Estimated LOE | % Completed | Vel. Pts |
---|---|---|---|---|
1 | Integration of the new bbtoolbox model | 5 | 80 | 4.0 |
2 | Modeler access to cluster | 1 | 10 | 0.1 |
3 | Release candidate distribution for v12.10 | 3 | 10 | 0.3 |
4 | Match simulation results between server and cluster | 2 | 66 | 1.3 |
5 | Generate first set of 50 realizations for LOMAP | 2 | 66 | 1.3 |
6 | Install bbp software usable on server and cluster | 3 | 0 | 0 |
7 | Data products list generated for validation runs | 2 | 0 | 0 |
8 | Calculate SI2 BBP Metrics | 1 | 10 | 0.1 |
9 | BBP input to EXSIM input config generator | 2 | 10 | 0.2 |
10 | Use low and high frequency limits on bias plots | 2 | 100 | 2 |
11 | Use RotD50 data on bias plot | 2 | 50 | 1 |
Total Sprint Velocity | 19 | 10.3 |
Sprint 6
- Sprint Dates: 10 Sept - 21 Sept
Priority | Sprint Task | Estimated LOE | % Completed | Vel Pts |
---|---|---|---|---|
1 | Implementation of the Arias duration GOF plots | 3 | 100 | 3.00 |
2 | Integration of new bbtoolbox model | 5 | 30 | 1.50 |
3 | Develop scripts to run bbp on cluster | 5 | 95 | 4.75 |
Total Sprint Velocity | 13 | 9.25 |
Sprint 5
- Sprint Dates - 27 August - 7 Sept
- Calculate velocity profiles (Vp,Vs,rho) for all California validation events
- Configure bbp to run on server or cluster
- Add Arias duration into validation pipeline
- Add Site Correction Module into validation pipeline
- End-to-end validation pipeline with both obs and sim processing
- Integrate new bbtoolbox codes into pipeline
- Configure UCSB and SDSU methods to run LOMAP
- Fill out 6 panel bias plots based on 3 methods running on server and cluster
- Install bbp software usable on server and cluster
- Prepare Broadband 12.8.0 Release, including:
- Run full validation tests for three main methods run on both server and cluster.
- Produce 12.8.0 distributions of validation and velocity model packages
- Update Documentation including Installation and User Guide
Sprint 4
- Sprint Dates - 13 August - 24 August
- Calculate velocity profiles for Landers and Hector Mine station sites
- Configure UCSB and SDSU methods to run LOMAP
- Post bias plots for LOMAP for 3 main methods on server and on cluster
- Add method that raises uncatchable exception to bbp_utils to identify unexpected conditions
- Add arias duration into validation pipeline
- Add rotd50 into validation pipeline
- Check rotd50 results from platform against results from CG
- Add site correction module to process observed seismograms
- Add observation data processing into validation pipeline
- End-to-end validation pipeline with both obs and sim processing.
- Data products list generated for validation runs.
- Make site response processing optional for validation runs
- Update GP codebase with compiler changes
- Prepare Broadband 12.8.0 Release
- Run full validation tests for three main methods run on both server and cluster.
- Produce 12.8.0 distributions of validation and velocity model packages
- Update Documentation including Installation and User Guide
Sprint 3
- Sprint Dates: 30 July - 10 August
- Routine plotting of LOMAP full validation with comparison acceleration plots (with fixed label), and Bias GOF plots for LOMA Prieta
- LOMAP workflow changed to include rupture generator
- Wiki site updated to contain current input files, current GOF, and example comparison plots
- URS modules renamed to GP
- Documentation on how to setup new GF and validation data
- DB code and PEER formatter included in trunk
- Rupture generator parameters separated into user selectable (), and modeler adjustable (DLEN, DWID, DT)
- ROTD50 running with acceptance test and producing file as part of LOMAP
- ARIAS running with acceptance test and producing file as part of LOMAP
- Integrate new bbtoolbox into platform
Sprint 2
- Sprint Dates: 16 July - 27 July
Priority | Sprint Task | Estimated LOE | % Complete | Vel. Pts |
---|---|---|---|---|
1 | Change validation processing so users specify GF used in processing | 10 | 100 | 10 |
Total Sprint Velocity | 10 | 10 |
Sprint 1
- Sprint Dates: 2 July - 13 July
Priority | Sprint Task | Estimated LOE | % Complete | Vel. Pts |
---|---|---|---|---|
1 | Separate Validation Data from BBP software distribution | 10 | 100 | 10.0 |
Total Sprint Velocity | 10 | 10.0 |