Difference between revisions of "Staff Priorities - David"

From SCECpedia
Jump to navigationJump to search
(Replaced content with "== Followups == * No")
 
(448 intermediate revisions by one other user not shown)
Line 1: Line 1:
== Yesterday ==
 
 
- Meeting with PM on UCVM<br />
 
- Going to deliver easier to install UCVM<br />
 
&nbsp;&nbsp;&nbsp;&nbsp;- Targeting code freeze by Aug 23<br />
 
- Began work, CenCalVM<br />
 
&nbsp;&nbsp;&nbsp;&nbsp;- SCECpedia distributes 0.6.6 vs 0.8.0<br />
 
- Also, no response from Rob on GTL versions<br />
 
- Database troubles for ShakeOut<br />
 
 
== Today ==
 
 
- ShakeOut day<br />
 
- Generate isosurface for interns
 
 
== Blocked ==
 
 
- No
 
 
 
== Followups ==  
 
== Followups ==  
  
- CyberShake calls
+
* No

Latest revision as of 16:47, 26 May 2017

Followups

  • No