Difference between revisions of "Staff Priorities - Masha"

From SCECpedia
Jump to navigationJump to search
 
(405 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
=== Yesterday ===
 
=== Yesterday ===
 
+
* Fixed configuration for TX and WX evaluation of one-day-models-V16.7 vs one-day-models-V12.10 groups
* CSEP:  
+
* Responded to Josh G. at UCLA regarding model submission
** Posted USGS vs RELM retrospective evaluation for 2006-2010, 2006-1013 testing periods for Max
+
* ComCat integration within CSEP:
** Started USGS vs RELM retrospective evaluation for 1967-2007 testing period with ebel.corrected forecast
+
** Lynda L. at USGS responded regarding ComCat
** Acceptance tests for M8FOG evaluation test
+
** Installed libcomcat, does not support Python3
  
 
=== Today ===
 
=== Today ===
 +
* Max W. request for latest CSEP data and figures
 +
* csep-op: retrospective evaluation of simulated forecasts
 +
* ComCat integration within CSEP
  
* EEW: review of ShakeAlert Performance testing summary by Phil
+
'''Blocked''': No
 
 
* CSEP:
 
** Add new forecasts groups for M8 assessment
 
** Support for 30-minute forecast class within testing framework
 
** Update wiki forecast example page per Andy's suggestions
 
 
 
=== TODO ===
 
 
 
* CSEP:
 
** Danijel/Max request: USGS vs RELM retrospective evaluation for 2008-2013 testing period with ebel.corrected forecast
 
 
 
'''Blocked''': None
 
  
'''Followups''': with Jeremy at noon on M8FOG results display and frequency of evaluation
+
'''Followups''': No
  
 
== Responsiblities ==
 
== Responsiblities ==

Latest revision as of 17:34, 22 August 2016

Current Activities

Yesterday

  • Fixed configuration for TX and WX evaluation of one-day-models-V16.7 vs one-day-models-V12.10 groups
  • Responded to Josh G. at UCLA regarding model submission
  • ComCat integration within CSEP:
    • Lynda L. at USGS responded regarding ComCat
    • Installed libcomcat, does not support Python3

Today

  • Max W. request for latest CSEP data and figures
  • csep-op: retrospective evaluation of simulated forecasts
  • ComCat integration within CSEP

Blocked: No

Followups: No

Responsiblities