Difference between revisions of "Earthquake Response"

From SCECpedia
Jump to navigationJump to search
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
'''Planning for ShakeOut'''
+
== Planning for ShakeOut ==
 +
Plans for 2010 ShakeOut Response Planning. Tasks are described as (Local (people at SCEC) and Universal (people anywhere))
  
'''Activities at SCEC'''
+
== Earthquake Response Steps (Local/Universal) ==
# Confirm operation of CISN Display at SCEC Headquarters
 
# Creation of Event Movie for ShakeOut Event
 
## Recent Seismicity main-shock - 24 through mainshock
 
## Faults plots CFM faults
 
  
# Physical location of Servers to check on power supply
+
*Information Display Available to SCEC HQ
##
+
**Confirm operation of CISN Display at SCEC Headquarters (Local)
##
+
**Creation of Event Movie for ShakeOut Event (Universal)
 
+
** Recent Seismicity main-shock - 24 through mainshock
'''Activities away from SCEC'''
+
** Faults plots CFM faults
#Login into Event Response Web Site
+
** Animation created and posted on public web site
#Movie of rupture
+
**Confirm Information from Public through display of Broadcast news at SCEC HQ
#Movie of earthquake
+
*Inspection of Physical Servers  
 +
** Walk to to check on power supply (Local)
 +
** Physical inspection of server room (Local)
 +
** Posting of Inspection posted
 +
*Create of Event Movie for ShakeOut Event (Universal)
 +
** Recent Seismicity main-shock - 24 through mainshock
 +
** Faults plots CFM faults
 +
** Animation created and posted in public site
 +
*Collect Source Information
 +
** ShakeMap instrumental intensity map
 +
** Broadband seismogrrams from CyberShake rupture
 +
** CyberShake rupture identified that matches event
 +
** Convert SRF to Olsen source format
 +
** Broadband to create waveform-based ShakeMap
 +
** Finite focal mechansim for event
 +
* Get Updated reports SCEC System
 +
** OpenSHA ShakeMap
 +
** CSEP forecast results
 +
** EEW Report for this Event
 +
** Run wave propagation simulation

Latest revision as of 17:57, 13 October 2010

Planning for ShakeOut

Plans for 2010 ShakeOut Response Planning. Tasks are described as (Local (people at SCEC) and Universal (people anywhere))

Earthquake Response Steps (Local/Universal)

  • Information Display Available to SCEC HQ
    • Confirm operation of CISN Display at SCEC Headquarters (Local)
    • Creation of Event Movie for ShakeOut Event (Universal)
    • Recent Seismicity main-shock - 24 through mainshock
    • Faults plots CFM faults
    • Animation created and posted on public web site
    • Confirm Information from Public through display of Broadcast news at SCEC HQ
  • Inspection of Physical Servers
    • Walk to to check on power supply (Local)
    • Physical inspection of server room (Local)
    • Posting of Inspection posted
  • Create of Event Movie for ShakeOut Event (Universal)
    • Recent Seismicity main-shock - 24 through mainshock
    • Faults plots CFM faults
    • Animation created and posted in public site
  • Collect Source Information
    • ShakeMap instrumental intensity map
    • Broadband seismogrrams from CyberShake rupture
    • CyberShake rupture identified that matches event
    • Convert SRF to Olsen source format
    • Broadband to create waveform-based ShakeMap
    • Finite focal mechansim for event
  • Get Updated reports SCEC System
    • OpenSHA ShakeMap
    • CSEP forecast results
    • EEW Report for this Event
    • Run wave propagation simulation