Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
 
(480 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yesterday: ==
+
== Project/Product Backlog ==
* Contact SRL editor
+
* Prepare Data Management talk for GMSV
* Contact ED about EC project
+
* Schedule PE's
* Work with DG on 1D model for CyberShake
+
*
* Check with KO RG on Moho
 
* Check on BBP Storage Status
 
* Talk with EL
 
  
== Today: ==
+
== Related Entries ==
* PC feedback
+
*[[CME Project]]
* DOE INCITE 2013 Final Report
+
*[[Staff]]
* Send out Geo Call Announce
 
* Confirm SI2 meeting
 
* TTI writeup "to general to be diagnostic, but inclusive for reporting"
 
 
 
== Blocked: ==
 
* No
 
 
 
== Followups: ==
 
* DG conversion from 1D file to UCVM 1D config
 
 
 
== Pending: ==
 
* FW ABF into CME codebase
 
* Formalize the simulation plans for NR
 
* Find images from CMU of circular GTL structures
 
* Security Discussion with SC
 
* Backup strategy with group
 
* Setup license meeting with Stevens USC
 
* Create Storage Map for SCEC Storage (SC)
 
* Updated BBP and UCVM required docs to include "known problems" file
 

Latest revision as of 23:42, 31 January 2018

Project/Product Backlog

  • Prepare Data Management talk for GMSV
  • Schedule PE's

Related Entries