|
|
| (474 intermediate revisions by the same user not shown) |
| Line 1: |
Line 1: |
| − | == Yesterday: == | + | == Project/Product Backlog == |
| − | * DOE INCITE 2013 Final Report w/ GE | + | * Prepare Data Management talk for GMSV |
| − | * DOE INCITE 2013 Final Report w/ PC
| + | * Schedule PE's |
| − | * BBP 1D model follow-up with DG
| + | * |
| − | * Coordinate EC Call with ED | |
| − | * Review SRR from SC | |
| − | ** Requests: add CVM-H GTL Maps w/ test stations
| |
| − | ** Requests: add 1D plots w/ 1km transition to Moho
| |
| | | | |
| − | == Today: == | + | == Related Entries == |
| − | * Review TRR | + | *[[CME Project]] |
| − | * Review TRR from SC
| + | *[[Staff]] |
| − | * EC Call with ED
| |
| − | * Update EC prospectus
| |
| − | * PC feedback
| |
| − | * Send out Geo/SI2 Call Announce
| |
| − | * TTI one pager
| |
| − | | |
| − | == Blocked: ==
| |
| − | * No
| |
| − | | |
| − | == Followups: ==
| |
| − | * Nvidia meeting at 1:30pm
| |
| − | | |
| − | == Pending: ==
| |
| − | * Confirm SI2 meeting
| |
| − | * CS parallelism discussion with SC
| |
| − | * FW ABF into CME codebase
| |
| − | * Formalize the simulation plans for NR
| |
| − | * Find images from CMU of circular GTL structures
| |
| − | * Security Discussion with SC
| |
| − | * Backup strategy with group
| |
| − | * Setup license meeting with Stevens USC
| |
| − | * Create Storage Map for SCEC Storage (SC)
| |
| − | * Updated BBP and UCVM required docs to include "known problems" file | |