Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 17: Line 17:
 
* Check whether new NGA relations are needed in BBP
 
* Check whether new NGA relations are needed in BBP
 
* Develop BBP paper outline
 
* Develop BBP paper outline
 +
* Return template to ED
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 17:16, 3 April 2014

Yesterday:

  • Get updated SA binaries for SCEC
  • Missed CSEP Call (12noon)
  • SCEC current HPCC Storage Map
  • Confirmed XAB travel plan [4/16 - 4/21]
  • Meeting on GTL and CVM-S5

Today:

  • Geo Call (11am)
  • BW Call (1pm)
  • Web Interview (4pm)
  • Local SCEC Storage map
  • Send SA User Display to TH
  • Test seism email list
  • Fix issues with Geo email list
  • get AWP to SRF converter from KBO
  • Check whether new NGA relations are needed in BBP
  • Develop BBP paper outline
  • Return template to ED

Blocked:

  • No

Followups:

  • No

Pending:

  • Setup license meeting with Stevens USC
  • FW ABF into CME codebase
  • Find images from CMU of circular GTL structures
  • Backup strategy with group
  • Updated BBP and UCVM required docs to include "known problems" file