Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* Get updated SA binaries for SCEC
+
* Web call (10:30am)
* Missed CSEP Call (12noon)
+
* High-F call (11am)
* SCEC current HPCC Storage Map
+
* CyberShake (11:30am)
* Confirmed XAB travel plan [4/16 - 4/21]
+
* Admin coordination (1pm)
* Meeting on GTL and CVM-S5
+
* BW Abstract submitted
 +
* Proposal development
 +
* DIBBS Letter to ED
  
 
== Today: ==
 
== Today: ==
* Geo Call (11am)
+
* AWP to SRF Converter (11am)
* BW Call (1pm)
 
* Web Interview (4pm)
 
 
* Local SCEC Storage map
 
* Local SCEC Storage map
 
* Send SA User Display to TH
 
* Send SA User Display to TH
 
* Test seism email list
 
* Test seism email list
 
* Fix issues with Geo email list
 
* Fix issues with Geo email list
* get AWP to SRF converter from KBO
+
* Backup strategy with group
* Check whether new NGA relations are needed in BBP
 
* Develop BBP paper outline
 
* Return template to ED
 
  
 
== Blocked: ==
 
== Blocked: ==
Line 26: Line 23:
  
 
== Pending: ==
 
== Pending: ==
 +
* Develop BBP paper outline
 +
* GMPE New relations integrated into BBP
 +
* FW ABF into CME codebase
 
* Setup license meeting with Stevens USC
 
* Setup license meeting with Stevens USC
* FW ABF into CME codebase
 
 
* Find images from CMU of circular GTL structures
 
* Find images from CMU of circular GTL structures
* Backup strategy with group
 
 
* Updated BBP and UCVM required docs to include "known problems" file
 
* Updated BBP and UCVM required docs to include "known problems" file

Revision as of 15:46, 9 April 2014

Yesterday:

  • Web call (10:30am)
  • High-F call (11am)
  • CyberShake (11:30am)
  • Admin coordination (1pm)
  • BW Abstract submitted
  • Proposal development
  • DIBBS Letter to ED

Today:

  • AWP to SRF Converter (11am)
  • Local SCEC Storage map
  • Send SA User Display to TH
  • Test seism email list
  • Fix issues with Geo email list
  • Backup strategy with group

Blocked:

  • No

Followups:

  • No

Pending:

  • Develop BBP paper outline
  • GMPE New relations integrated into BBP
  • FW ABF into CME codebase
  • Setup license meeting with Stevens USC
  • Find images from CMU of circular GTL structures
  • Updated BBP and UCVM required docs to include "known problems" file