Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* Web call (10:30am)
 
* High-F call (11am)
 
* CyberShake (11:30am)
 
* Admin coordination (1pm)
 
* BW Abstract submitted
 
* Proposal development
 
* DIBBS Letter to ED
 
 
== Today: ==
 
 
* AWP to SRF Converter (11am)
 
* AWP to SRF Converter (11am)
 
* Local SCEC Storage map
 
* Local SCEC Storage map
Line 15: Line 6:
 
* Fix issues with Geo email list
 
* Fix issues with Geo email list
 
* Backup strategy with group
 
* Backup strategy with group
 +
 +
== Today: ==
 +
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 16:37, 10 April 2014

Yesterday:

  • AWP to SRF Converter (11am)
  • Local SCEC Storage map
  • Send SA User Display to TH
  • Test seism email list
  • Fix issues with Geo email list
  • Backup strategy with group

Today:

Blocked:

  • No

Followups:

  • No

Pending:

  • Develop BBP paper outline
  • GMPE New relations integrated into BBP
  • FW ABF into CME codebase
  • Setup license meeting with Stevens USC
  • Find images from CMU of circular GTL structures
  • Updated BBP and UCVM required docs to include "known problems" file