Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | *Produced TEST hazard curve with new RV generator, emailed to group |
− | * | + | *Produced SBSM, WNGC, PAS hazard curves with new RV generator |
− | + | *Emailed Phil XSEDE SU estimate for CyberShake work | |
− | * | + | *Reviewed storage spreadsheet |
− | |||
− | * | ||
− | |||
== Today == | == Today == | ||
− | * | + | *Produce USC hazard curve |
− | * | + | *Calculate comparison curves, send out to group |
− | * | + | *Work on 200m rupture point spacing with new RVs |
+ | **Calculate and insert into DB | ||
+ | **Locate 200m SGTs | ||
+ | **Queue curve | ||
== Blocked == | == Blocked == | ||
Line 17: | Line 17: | ||
== Follow-ups == | == Follow-ups == | ||
− | * | + | *SEISM call |
Revision as of 17:09, 10 April 2014
Yesterday
- Produced TEST hazard curve with new RV generator, emailed to group
- Produced SBSM, WNGC, PAS hazard curves with new RV generator
- Emailed Phil XSEDE SU estimate for CyberShake work
- Reviewed storage spreadsheet
Today
- Produce USC hazard curve
- Calculate comparison curves, send out to group
- Work on 200m rupture point spacing with new RVs
- Calculate and insert into DB
- Locate 200m SGTs
- Queue curve
Blocked
- No
Follow-ups
- SEISM call
- Try out SeedMe so I can respond to Amit
- Start drafting abstract for extreme scaling
- Revise DAX generator to group output by source
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration