Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 8: | Line 8: | ||
== Today: == | == Today: == | ||
+ | * Post laptop storage table on wiki | ||
+ | * Schedule BBP code review | ||
* BBP Call (2pm) | * BBP Call (2pm) | ||
* Test seism email list | * Test seism email list | ||
* Fix issues with Geo email list | * Fix issues with Geo email list | ||
− | + | * Setup TJ/JT coordination call | |
== Blocked: == | == Blocked: == |
Revision as of 16:56, 11 April 2014
Contents
Yesterday:
- SEISM Call (11am)
- HPCC Storage map on wiki
- Review partitioning of new storage
- Contact BW on uofm student access
- Collected laptop backup information from group
- Collected XSEDE Allocation estimates
Today:
- Post laptop storage table on wiki
- Schedule BBP code review
- BBP Call (2pm)
- Test seism email list
- Fix issues with Geo email list
- Setup TJ/JT coordination call
Blocked:
- No
Followups:
- No
Pending:
- Develop BBP paper outline
- GMPE New relations integrated into BBP
- FW ABF into CME codebase
- Setup license meeting with Stevens USC
- Updated BBP and UCVM required docs to include "known problems" file