Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* XSEDE Allocation Development
+
* XSEDE Advisory Board Meeting
  
 
== Today: ==
 
== Today: ==
* 11am High-F XSEDE allocation call
+
* HPCC Meeting (12pm)
* 1:30pm BBP Meeting
+
* BBP Code Review (1pm)
* File XSEDE Allocation
 
 
* Prepare extended BW Abstract
 
* Prepare extended BW Abstract
* Prepare for XSEDE Advisory Board Meeting
 
 
* Setup TJ/JT coordination call
 
* Setup TJ/JT coordination call
 
* Develop BBP paper outline
 
* Develop BBP paper outline
Line 19: Line 17:
 
== Pending: ==
 
== Pending: ==
 
* Post laptop storage table on wiki
 
* Post laptop storage table on wiki
* Schedule BBP code review
 
* BBP Call (2pm)
 
 
* Test seism email list
 
* Test seism email list
 
* Fix issues with Geo email list
 
* Fix issues with Geo email list

Revision as of 16:55, 23 April 2014

Yesterday:

  • XSEDE Advisory Board Meeting

Today:

  • HPCC Meeting (12pm)
  • BBP Code Review (1pm)
  • Prepare extended BW Abstract
  • Setup TJ/JT coordination call
  • Develop BBP paper outline

Blocked:

  • No

Followups:

  • No

Pending:

  • Post laptop storage table on wiki
  • Test seism email list
  • Fix issues with Geo email list
  • GMPE New relations integrated into BBP
  • FW ABF into CME codebase
  • Setup license meeting with Stevens USC
  • Updated BBP and UCVM required docs to include "known problems" file