Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 5: Line 5:
  
 
== Today ==
 
== Today ==
 +
*Insert 2s PSA values into DB from Study 14.2, all 3 velocity models
 
*Plot comparison curves of 200m v 1000m TEST site
 
*Plot comparison curves of 200m v 1000m TEST site
 
*Check FFTW version of rupture generator for similarity of results
 
*Check FFTW version of rupture generator for similarity of results
 
*Get timing data with rupture variation generator to Yifeng
 
*Get timing data with rupture variation generator to Yifeng
 +
*Run test to see if locality matters
  
 
== Blocked ==
 
== Blocked ==

Revision as of 20:16, 22 April 2014

Yesterday

  • Tried out Lync with Blue Jeans - success!
  • Debugged new seg faults, produced 200m curve, looks good
  • Tested FFTW version of rupture generator - 5% faster

Today

  • Insert 2s PSA values into DB from Study 14.2, all 3 velocity models
  • Plot comparison curves of 200m v 1000m TEST site
  • Check FFTW version of rupture generator for similarity of results
  • Get timing data with rupture variation generator to Yifeng
  • Run test to see if locality matters

Blocked

  • No

Follow-ups

  • CyberShake calls
  • May 12 planning call (2 pm)


  • Try out SeedMe so I can respond to Amit


Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration