Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 2: Line 2:
 
* XSEDE Advisory Board Meeting
 
* XSEDE Advisory Board Meeting
 
* Meeting with THJ on NGA
 
* Meeting with THJ on NGA
 
+
* Kraken Highlights
== Today: ==
 
 
* HPCC Meeting (12pm)
 
* HPCC Meeting (12pm)
 
* BBP Code Review (1pm)
 
* BBP Code Review (1pm)
 
* Prepare extended BW Abstract (Due 15 April)
 
* Prepare extended BW Abstract (Due 15 April)
 +
* IP Meeting (Thursday)
 +
* Setup TJ/JT coordination call
 +
 +
== Today: ==
 +
* XS Abstract
 
* Develop BBP paper outline
 
* Develop BBP paper outline
 +
* BBP Call (2pm)
 
* Heartbl response
 
* Heartbl response
* Kraken Highlights
+
 
  
 
== Blocked: ==
 
== Blocked: ==
Line 18: Line 23:
  
 
== Pending: ==
 
== Pending: ==
* IP Meeting (Thursday)
 
* Setup TJ/JT coordination call
 
* XS Abstract
 
 
* Post laptop storage table on wiki
 
* Post laptop storage table on wiki
 
* Test seism email list
 
* Test seism email list

Revision as of 17:05, 25 April 2014

Yesterday:

  • XSEDE Advisory Board Meeting
  • Meeting with THJ on NGA
  • Kraken Highlights
  • HPCC Meeting (12pm)
  • BBP Code Review (1pm)
  • Prepare extended BW Abstract (Due 15 April)
  • IP Meeting (Thursday)
  • Setup TJ/JT coordination call

Today:

  • XS Abstract
  • Develop BBP paper outline
  • BBP Call (2pm)
  • Heartbl response


Blocked:

  • No

Followups:

  • No

Pending:

  • Post laptop storage table on wiki
  • Test seism email list
  • Fix issues with Geo email list
  • GMPE New relations integrated into BBP
  • FW ABF into CME codebase
  • Setup license meeting with Stevens USC
  • Updated BBP and UCVM required docs to include "known problems" file