Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Determined cost of 1 Hz run
+
*Calculated probabilistic results for all 14 sites with NGA comparisons
*Sent out 1 Hz results, need to investigate results
+
*Posted probabilistic results to wiki, emailed to group
*Compared Titan workflow results to reference solution, good match
+
*Added 1 Hz cost to wiki
*Calculated deterministic results for LADT
 
*Emailed Peter and Nico about deterministic NGA calcs
 
*Touched base with Phil
 
  
 
== Today ==
 
== Today ==
*Calculate probabilistic results for all 14 sites with NGA comparisons, post to wiki, notify group
+
*Make SC travel plans
 +
*Perform deterministic calculation for 14 sites
 
*Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
 
*Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
*Add 1 Hz cost to wiki
 
 
*Consult with Gideon about Titan next steps
 
*Consult with Gideon about Titan next steps
  

Revision as of 17:03, 10 October 2014

Yesterday

  • Calculated probabilistic results for all 14 sites with NGA comparisons
  • Posted probabilistic results to wiki, emailed to group
  • Added 1 Hz cost to wiki

Today

  • Make SC travel plans
  • Perform deterministic calculation for 14 sites
  • Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
  • Consult with Gideon about Titan next steps

Blocked

  • No

Follow-ups

  • No

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration